My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent Calendar 2018 0220
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0220
>
8F Consent Calendar 2018 0220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 1:44:52 PM
Creation date
2/14/2018 1:44:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
2/20/2018
Retention
PERM
Document Relationships
Reso 2018-010
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 18-005 <br />submitted proposals. Cal Engineering and Geology was selected as the most qualified firm to <br />provide services based on a history of success with similar projects as well as insightful <br />recommendations for use of a seismic refraction survey to potentially reduce project limits and <br />costs. <br />This contract represents the current understanding of the work required. Occasionally changes to <br />the scope of contracts are necessary to respond to new information or to include additional items <br />of work necessary for a complete product. In order to resolve these issues in a timely fashion and <br />avoid delaying work, staff requests authorization to issue individual change orders to the <br />consultant up to 10% or $20,545 each and cumulative change orders up to 20%, or $41,091 of <br />the original contract. <br />Current Agency Policies <br />Maintain and enhance San Leandro’s infrastructure <br />Applicable General Plan Policies <br />Policy CSF-6.8 Ensure that sufficient funding is provided for the ongoing maintenance of <br />City-owned facilities, including streets, street lights, traffic signals, landscaping, street trees, <br />storm drains, public buildings and other infrastructure. <br />Environmental Review <br />This project for environmental clearance purposes is considered a minor alteration of an existing <br />public roadway with no increase in capacity and is thus Categorically Exempt per CEQA Section <br />15301 (c). A Categorical Exemption notice will be filed with Alameda County during the design <br />phase of the project. <br />Summary of Public Outreach Efforts <br />The public will be notified in advance of construction work and information will be provided to the <br />neighboring property owners. There is no formal outreach planned for the design phase. <br />Fiscal Impacts <br />This contract is for $205,458 with authorization to issue individual change orders to the consultant <br />up to 10% or $20,545 each and cumulative change orders up to 20%, or $41,092 of the original <br />contract. If the maximum change order amount is used the contract value will be $246,550. <br />The total cost of the design phase of this project is $260,000 and will be funded from existing <br />appropriations as described below. <br />Construction of the improvements is a different project that will be funded separately. The <br />construction cost will be determined during design and is estimated to be up to $5,000,000. <br />Page 2 City of San Leandro Printed on 2/13/2018 <br />1071
The URL can be used to link to this page
Your browser does not support the video tag.