Laserfiche WebLink
116 <br /> <br />6.5 NATURAL HAZARDS STRATEGIES <br /> <br />Mitigation Strategy #1 <br />Strategy <br />Name* <br />Point Source Perform analysis of existing point sources of flooding as reflected <br />by FEMA’s proposed new FIRM maps as a result of the Bay Area Coastal Study <br />conducted by FEMA and formulate a plan to mitigate the identified sources from <br />potential flooding points. <br />Hazard(s) <br />Addressed <br />Earthquake <br />Ground <br />Shaking <br />Earthquake <br />Tsunami <br />Current <br />Flooding <br />Future <br />Flooding Wildfire Landslide Climate <br />Change <br />Strategy Type <br />Evaluation Program/ <br />Operation <br />Policy <br />Development Coordination Education/ <br />Outreach <br />Process/ <br />Implementatio <br />n Mechanism <br />Long-Range <br />Planning <br />Land Use <br />Planning <br />Capital <br />Planning Operations <br />Emergency <br />& Hazards <br />Planning <br />Project <br />Planning & <br />Design <br />New <br />Initiatives <br />Responsible <br />Agency* <br />Engineering and Transportation <br />Partners* N/A <br />STRATEGY IMPLEMENTATION INFORMATION <br />Priority HIGH <br />Actions/ <br />Activities <br />Identify all point sources of flooding related to the <br />proposed FEMA map changes. <br /> <br />Analyze various scenarios to effectively prevent/mitigate <br />the flooding from these point sources of flooding. <br /> <br />Develop a plan of action to prevent flooding at these <br />points through the most efficient and effective method. <br /> <br />Construct the necessary barriers to prevent flooding. <br /> <br />Submit all required documentation to FEMA to have <br />properties removed from the newly identified S.F.H.A. <br /> <br />Staff Lead City Engineer <br /> <br />Cost <br />Estimate* <br />$500,000.00 <br />Benefits (losses <br />avoided)* <br />Resiliency and use of critical facilities, following a disaster. <br /> <br />Potential <br />Funding <br />Sources* <br />Grant, Property Assessment, General Fund of City of San Leandro <br /> <br />Timeline* Completed within 3 years of funding. <br /> <br />155