My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2018 0319
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0319
>
5A Public Hearings 2018 0319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:25:09 AM
Creation date
3/14/2018 11:25:02 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/19/2018
Retention
PERM
Document Relationships
Reso 2018-020
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Conditions of Approval January 4, 2018 <br />PLN17-0061 Page 1 of 11 <br />CONDITIONS OF APPROVAL <br /> <br />PLN17-0061 <br />1604 and 1642 San Leandro Boulevard <br />S. Criscimagna, Eden Housing, Inc. (Applicant) <br />Parrott Street Investors, LLC (Property Owner) <br /> <br />I. COMPLIANCE WITH APPROVED PLANS <br /> <br />A. The project shall comply with Exhibits A through CC, dated January 4, 2018 except as <br />hereinafter modified. (Exhibits are on file at the City of San Leandro, Community <br />Development Department, 835 East 14th Street, San Leandro, California, 94577). <br /> <br />Exhibit A - Coversheet A0.0 <br />Exhibit B - Project Data A0.1 <br />Exhibit C - Existing Site Conditions A0.2 <br />Exhibit D - Site Plan A1.0 <br />Exhibit E - Building Plan (Ground Level and Podium Level) A2.0 <br />Exhibit F - Building Plan (Level 3 and Level 4) A2.1 <br />Exhibit G - Building Plan (Level 5 and Roof Plan) A2.2 <br />Exhibit H - Courtyard Exiting Diagram A2.3 <br />Exhibit I - Elevations (San Leandro Boulevard) A3.0 <br />Exhibit J - Elevations (Parrott Street) A3.1 <br />Exhibit K - Sections A4.0 <br />Exhibit L - Architectural Details (Windows) A6.0 <br />Exhibit M - Architectural Details (Windows and Stoops) A6.1 <br />Exhibit N - Architectural Details (Signage) A6.2 <br />Exhibit O - Lighting Fixtures A6.3 <br />Exhibit P - Egress Windows A6.4 <br />Exhibit Q - Color and Material Board A7.0 <br />Exhibit R - Perspective (Parrott Street) A8.0 <br />Exhibit S - Perspective (San Leandro Boulevard) A8.1 <br />Exhibit T - Landscape Concept Plan L1.1 <br />Exhibit U - Landscape Concept Plan (Podium Level 2) L1.2 <br />Exhibit V - Landscape Concept Plan (Site Furnishings) L1.3 <br />Exhibit W - Landscape Concept Plan (Plant Images) L1.4 <br />Exhibit X - Existing Conditions C1.1 <br />Exhibit Y - Preliminary Grading and Drainage C1.2 <br />Exhibit Z - Preliminary Utility Plan and Offsite Improvements C1.3 <br />Exhibit AA - Preliminary Stormwater Control Plan C1.4 <br />Exhibit BB - Joint Trench Title Sheet INT1 <br />Exhibit CC - Joint Trench INT2 <br /> <br />B. The developer shall be responsible for assuring that any successor in interest who <br />assumes responsibility for this zoning approval is informed of its terms and conditions. <br /> <br />C. Site Plan Review approval shall lapse after one (1) year following Board of Zoning <br />Adjustments approval of the application unless a grading permit or building permit has <br />been issued, coupled with diligent progress evidencing good faith intention to <br />38
The URL can be used to link to this page
Your browser does not support the video tag.