Laserfiche WebLink
Conditions of Approval January 4, 2018 <br />PLN17-0061 Page 2 of 11 <br />commence the intended use; or an occupancy permit has been issued; or the approval is <br />renewed, as provided in Section 5-2218.E. Pursuant to Zoning Code Section 5-2218.E. <br />upon written request the approval may be renewed by the Zoning Enforcement Official <br />for one (1) year, with one additional (1) one-year renewal allowed for a total period not <br />to exceed two (2) years without notice or public hearing if the findings required by <br />Section 2-580.H. remain valid. Application for renewal shall be made in writing to the <br />Community Development Director not less than 30 days or more than 120 days prior to <br />expiration of the Site Plan Review approval. Denial of a request for renewal of the <br />Project approval may be appealed. <br /> <br />II. PERMITTED USE <br /> <br />A. This Site Plan Review approval permits construction of a 62-unit multi-family <br />residential building that includes 22 studio units, 22 one-bedroom units and 18 two- <br />bedroom units, at 1604 and 1642 San Leandro Boulevard (southeast corner of San <br />Leandro Boulevard and Parrott Street). The proposed new building would be four-story <br />construction above a parking level that would contain 31 parking spaces. Assessor’s <br />Parcel Numbers 75-28-1-2 and 75-28-11-2. <br /> <br />B. No application for amendment of the application or Conditions of Approval may be <br />submitted or accepted for processing by the city unless (i) there is full compliance with <br />all other legally binding documents regulating development on the property; and (ii) <br />there is full compliance with all terms of the application and Conditions of Approval, or <br />(iii) the Community Development Director has waived compliance with the terms of the <br />application because they are minor in content. <br /> <br />C. Construction of the project shall remain in substantial compliance with the approved <br />exhibits and plans. The Zoning Enforcement Official may approve changes to approved <br />plans or in conditions of approval without a public hearing upon determining that the <br />changes in conditions are minor and are consistent with the intent of the original <br />approval. Revisions involving substantial changes in project design or conditions of <br />approval shall be treated as new applications, to be reviewed as a new project. <br /> <br />III. ADDITIONAL PLAN SUBMITTALS <br /> <br />A. Prior to issuance of building permits, applicant shall submit a checklist showing that the <br />project meets the minimum green building rating for a residential buildings, according <br />to the most current GreenPoint Rated for Newly-Constructed Residential Buildings, or <br />equivalent green building rating system as adopted by the City of San Leandro at the <br />time of submittal for building permits. Features indicated on said checklist shall be <br />incorporated into building permit plans. <br /> <br />B. Prior to issuance of building permits, all building plans and specifications shall be <br />submitted for review and approval to the Zoning Enforcement Official to ensure the <br />quality of the exterior design. Said plans and specifications shall indicate the exact type <br />of stucco, windows and framing, front doors, door and window trim, deck and porch <br />railings, garage door, solid waste/recycling room door, and light fixtures to ensure that <br />the new building’s exterior materials and finishes meet the standards illustrated in the <br />39