My WebLink
|
Help
|
About
|
Sign Out
Home
5B Public Hearings 2018 0319
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0319
>
5B Public Hearings 2018 0319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:25:31 AM
Creation date
3/14/2018 11:25:09 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/19/2018
Retention
PERM
Document Relationships
Reso 2018-021
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Reso 2018-022
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
94 ~ CiTY OF SAN LEANDRO BiCYCLE & PEDESTRiAN MASTER PLAN <br />Several of the existing facilities in San Leandro would benefit from spot <br />improvements to meet current best practices, better define the bikeway <br />network and improve its effectiveness, accessibility, and safety. Spot <br />improvements were divided into four general categories: <br />Signage/Marking improvements <br />intersection Configuration Changes <br />intersection Approach Change <br />Design Changes <br />Each category is described in more detail below; each description is <br />accompanied by a list of locations that require the relevant improvements. <br />Some locations are listed in more than one category. Specific treatments <br />should be considered on a spot-by-spot basis. These areas are based on input <br />from the public, members of the BPAC, and City Staff. The following lists are <br />not all inclusive. As the City reviews new projects and continues it's road <br />maintenance program, it should utilize these examples as case studies as more <br />intersections and street segments are found needing similar improvements. <br />Signage/Markings <br />Locations in this category are street segments that have existing facilities, but <br />are missing certain design element. These design elements include, but are not <br />limited to: pavement markings (sharrows/lane markings) and signs (Bike Route, <br />Bikes May Use Full Lane, etc.). There are 8 locations in this category. improving <br />the signage and pavement markings can help increase driver awareness of <br />bicyclists. <br />Spot Improvements <br />SIGNAGE/MARKINGS LOCATIONS <br />Striping/Pavement Markings <br />Neptune Drive: Oyster Bay Regional Park to Marina Boulevard <br />Monarch Bay Drive: Fairway Drive to southern end of street <br />MacArthur Boulevard: Dowling Boulevard to Joaquin Avenue/Grand <br />Avenue <br />Springlake Drive: Hesperian Boulevard to Loch Lane/Creekside Drive <br />Hesperian Boulevard: Grace Street to East 14th Street <br />Williams Street: Timothy Drive to Westgate Parkway <br />East 14th Street: Broadmoor Boulevard to City Limits <br />Signage <br />Davis Street at Frederick Road/Gilmore Drive (eastbound) <br />232
The URL can be used to link to this page
Your browser does not support the video tag.