My WebLink
|
Help
|
About
|
Sign Out
Home
5B Public Hearings 2018 0319
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0319
>
5B Public Hearings 2018 0319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:25:31 AM
Creation date
3/14/2018 11:25:09 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/19/2018
Retention
PERM
Document Relationships
Reso 2018-021
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Reso 2018-022
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
132 ~ CiTY OF SAN LEANDRO BiCYCLE & PEDESTRiAN MASTER PLAN <br />A series of highway underpass for I-238 over Hesperian Boulevard near Lewelling Boulevard. <br />The intersection of San Leandro Boulevard, Park Street, and Best Avenue, is an asymmetrical <br />partially stop controlled intersection near Siempre Verde Park. <br />19. 150th Avenue/Hesperian Boulevard/Bancroft Avenue/East 14th <br />Street Intersection: This wide intersection has not had recent <br />pedestrian improvements. Curb extensions, curb ramp improvements, <br />high visibility crosswalks, and pedestrian refuge islands will <br />make this intersection safer and more accessible for pedestrians. <br />The city is currently in the process of improving the traffic flow and safety <br />as a part of the San Leandro Triangle Project. The city is also exploring the <br />possibility of eliminating one leg of the triangle to create a wider, more <br />comfortable pedestrian plaza. <br />20. Hesperian Boulevard/Lewelling Boulevard Intersection: Where space <br />exists, the City should analyze if it is possible to remove free right turn <br />lanes and widen the existing central medians to provide pedestrian refuge <br />islands for pedestrians who are crossing this wide intersection. <br />21. San Leandro Boulevard/Park Street/Best Avenue Intersection: This <br />intersection is located next to the very popular and recently rehabilitated <br />Siempre verde Park. At this intersection, no crossings are marked and only <br />traffic from Best Avenue and Park Street are stop-controlled. Both crossing <br />and traffic calming improvements are necessary at this intersection <br />to improve pedestrian safety and visibility, especially, because of the <br />increased presence of families and children enjoying Siempre verde Park. <br />Through a resurfacing project, the City is reconfiguring San Leandro <br />Boulevard and this intersection to improve overall traffic safety. <br />22. Freeway Undercrossings for I-238, I-580, and I-880: San Leandro has <br />three freeways that run through it: i-238 in the Bay Fair area, i-580 in the <br />east, and i-880 running through the middle of the City. When the crossings <br />are established with underpasses, the City should work with Caltrans to <br />improve pedestrian facilities in these areas including sidewalks, lighting, <br />and traffic calming; especially, if there are freeway ramps nearby. <br />270
The URL can be used to link to this page
Your browser does not support the video tag.