My WebLink
|
Help
|
About
|
Sign Out
Home
5B Public Hearings 2018 0319
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0319
>
5B Public Hearings 2018 0319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:25:31 AM
Creation date
3/14/2018 11:25:09 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/19/2018
Retention
PERM
Document Relationships
Reso 2018-021
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Reso 2018-022
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
160 ~ CiTY OF SAN LEANDRO BiCYCLE & PEDESTRiAN MASTER PLAN <br />Engineering study is recommended to determine what roadway <br />modifications are necessary to implement a bike route and/or if bike <br />lanes can be provided wherever possible. <br />Class iii Bicycle Boulevard <br />Striping, signage and pavement markings where no other roadway <br />modifications are needed. <br />Striping, signage and pavement markings where roadway restriping and/ <br />or lane narrowing is needed. <br />Engineering study is recommended to determine what roadway <br />modifications/road diet strategies are necessary to implement bike <br />lanes wherever possible. <br />Class iv Separated Bike Lane <br />Striping, barrier devices, signage and pavement markings where no <br />other roadway modifications are needed. <br />Striping, barrier devices, signage and pavement markings where roadway <br />restriping and/or lane narrowing is needed. <br />Striping, barrier devices, signage and pavement markings where removal <br />of travel lane, parking or center two-way left-turn lane is needed. <br />Engineering study is recommended to determine what roadway <br />modifications are necessary to implement bike lanes wherever possible. <br />The proposed projects are described by roadway segment, length, existing and <br />proposed bikeway classification, conceptual cost, and total priority scoring in <br />Table 17. <br />298
The URL can be used to link to this page
Your browser does not support the video tag.