My WebLink
|
Help
|
About
|
Sign Out
Home
5B Public Hearings 2018 0319
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0319
>
5B Public Hearings 2018 0319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:25:31 AM
Creation date
3/14/2018 11:25:09 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/19/2018
Retention
PERM
Document Relationships
Reso 2018-021
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Reso 2018-022
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CiTY OF SAN LEANDRO BiCYCLE & PEDESTRiAN MASTER PLAN ~ 169 <br />Recommended Pedestrian Improvements: Priority Areas and Key Locations <br />Ped ID Location/Description Priority Points Cost Estimates* <br />B1: San Leandro Marina <br />B-1 A Monarch Bay Drive Sidewalks & Crosswalks 9 High <br />B-1 B Monarch Bay Drive and Neptune Drive Crossing 13 High <br />B-1 C Sidewalks and Curb Ramps in the Marina Shoreline Area 14 High <br />B-1 D Neptune Drive Crosswalks 4 High <br />B-1 E Williams Street and Neptune Drive Crossing 9 High <br />B-1 F West Avenue 130th Ped Facilities and Accessibility 9 Medium <br />B-1 G Pescador Point Drive Ped Facilities and Accessibility 5 Medium <br />B-1 H Monarch Bay Drive Mid-block Crossing near Mallard Picnic Area 7 Medium <br />B-1 i Pedestrian Facilities and Crossings at the intersection of Fairway Drive and Doolittle Drive 8 High <br />B2: Westgate Center <br />B-2 A Parking Lot Safety and Circulation improvements 5 High <br />B-2 B Pedestrian Crossing at Timothy Drive and Davis Street 9 High <br />B-2 C Pedestrian Crossing at Williams Street and Westgate Parkway 10 Medium <br />B3: Kaiser Medical Center/The Spine <br />B-3 A improve sidewalks in Kaiser Medical Center area 6 High <br />B4: Manor Boulevard <br />B-4 A Replace Rolled Curbs along Manor Boulevard 13 High <br />B-4 B More Crosswalks on Manor Boulevard 15 Low <br />B-4 C improve Pedestrian Facilities and Accessibility on Manor Boulevard 15 Low <br />B-4 D improve Pedestrian Crossings at Farnsworth Street and Manor Boulevard 15 Low <br />B-4 E improve Pedestrian Crossings at Manor Boulevard and inverness Street 8 Medium <br />B5: Washington Avenue <br />B-5 F Washington Avenue Streetscape improvements 15 High <br />B-5 G Washington Avenue/Halcyon Drive & Lewelling Boulevard crosswalks 15 High <br />B-5 H Washington Avenue Tunnel Pedestrian Connection 7 High <br />Table 19: Recommended Pedestrian Projects with Conceptual Costs and Priority Score <br />* Low Cost ($0-39,999); Medium Cost ($40,000-99,999); High Cost ($100,000 and up) <br />307
The URL can be used to link to this page
Your browser does not support the video tag.