Laserfiche WebLink
CiTY OF SAN LEANDRO BiCYCLE & PEDESTRiAN MASTER PLAN ~ 183 <br />Understanding the City’s investment in the existing bikeway and pedestrian <br />system and what is required to complete and maintain the system is important <br />in developing a funding strategy. Since the adoption of the 2010 Plan, San <br />Leandro has invested more than $6 million on pedestrian and bicycle projects <br />throughout the City. <br />Bikeway Network <br />With an approximate length of 43.4 miles, the existing bikeway network <br />represents a substantial investment. Completed projects since the previous <br />plan include: <br />„„Bicycle Network East Project <br />„„City Bicycle Rack Program <br />„„Education Programs <br />PEDESTRIAN IMPROVEMENTS <br />There have been substantial improvements for pedestrians in the years since <br />the 2010 Plan was completed. These projects include: <br />„„Accessible Pedestrian Signals <br />„„Accessible Ramps <br />„„Sidewalk Programs <br />„„San Leandro Boulevard BART interface <br />„„Bancroft Avenue/136th Avenue Signal and Scramble Crossing <br />„„Education Programs <br />Past Expenditures <br />A segment of bike lane near the Kaiser Medical Center area. <br />321