My WebLink
|
Help
|
About
|
Sign Out
Home
5B Public Hearings 2018 0319
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0319
>
5B Public Hearings 2018 0319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:25:31 AM
Creation date
3/14/2018 11:25:09 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/19/2018
Retention
PERM
Document Relationships
Reso 2018-021
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Reso 2018-022
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
198 ~ CiTY OF SAN LEANDRO BiCYCLE & PEDESTRiAN MASTER PLAN <br />Appendix B: Project Prioritization Worksheets <br />Bicycle Project Prioritization Worksheet <br />1) CONNECTION TO ACTIVITY CENTERS: How is access to key destinations improved by this project? The <br />project will provide access to: <br />Circle all that apply <br /> A) Schools 2 <br /> B) Major employment centers 1 <br /> C) Major shopping centers 1 <br /> D) Libraries 1 <br /> E) Park or recreational facilities 1 <br />2) Safety: How does the project improve bicycle safety? <br /> A) The project includes an intersection or roadway segment with a high number of bicycle collisions.2 <br /> B) The project provides an alternative to or separation for bicyclists on a busy arterial street.2 <br />3) Connectivity: How will the project improve connectivity for bicyclists? <br /> A) The project eliminates an existing barrier or hazard to bicycle access.1 <br /> B) The project bridges a gap in an existing bikeway.1 <br /> C) The project connects to an existing bikeway on both ends.1 <br /> D) The project connects to an existing or proposed bikeway on both ends.1 <br /> E) The project is located on or connects to the regional, county or Bay Trail network.1 <br /> F) The project connects to an existing or proposed bikeway in neighboring jurisdiction.1 <br /> G) The project is part of a bikeway that passes through the entire city.1 <br />4) Transit Access: How does the project improve bicycle access to transit? <br /> A) The project connects to a BART station.1 <br /> B) The project connects to a existing high capacity bus line or future BRT service.1 <br /> C) The project connects to a local bus route.1 <br />5) Funding & Implementation: Will the project be reasonably easy to implement? <br /> A) The project can be implemented without extensive additional planning or study.1 <br /> B) The project does not require extensive modifications to implement.1 <br />336
The URL can be used to link to this page
Your browser does not support the video tag.