Laserfiche WebLink
200 ~ CiTY OF SAN LEANDRO BiCYCLE & PEDESTRiAN MASTER PLAN <br />Pedestrian Project Prioritization Worksheet <br />1) Accessibility: How is accessibility improved by this project?Circle all that apply <br /> A) The project will create accessibility in a location that was previously inaccessible.1 <br /> B) The project will remove a major barrier/obstacle to accessibility in the citywide Pedestrian Network. 1 <br /> C) The project will include design features that are beyond the minimum required by ADA, i.e. extra wide sidewalks, verbal audible <br /> signals. 1 <br />2) Safety: How does the project improve pedestrian safety? <br /> A) The project is located at an intersection with a high number of pedestrian collisions.2 <br /> B) The project is located within 1,500 feet of a school. 2 <br /> C) The project includes additional design features to increase pedestrian safety, i.e. pedestrian refuge islands, bulbouts, pedestrian <br /> actuated signals.1 <br />3) Connectivity: How will the project improve connectivity? The project is located near a: <br /> A) School 2 <br /> B) Major employment center 1 <br /> C) Major shopping center 1 <br /> D) Library 1 <br /> E) Park or recreation facility 1 <br /> F) Major transit route/stop 1 <br />4) Walkability: How does the project improve the pedestrian environment and encourage walking? <br /> A) The project includes pedestrian amenities such as seating, lighting and trash receptacles.1 <br /> B) The project creates plazas, or open spaces that will allow for public gatherings and encourage pedestrian use.1 <br />5) Funding & Implementation: Will the project be reasonably easy to implement? <br /> A) The project can be implemented without extensive additional planning or study.1 <br /> B) The project does not require extensive modifications to implement.1 <br /> C) The project can be implemented as part of another development or redevelopment project.1 <br /> D) The project can be implemented without coordination with agencies outside the City.1 <br />338