My WebLink
|
Help
|
About
|
Sign Out
Home
5B Public Hearings 2018 0319
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0319
>
5B Public Hearings 2018 0319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:25:31 AM
Creation date
3/14/2018 11:25:09 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/19/2018
Retention
PERM
Document Relationships
Reso 2018-021
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Reso 2018-022
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CiTY OF SAN LEANDRO BiCYCLE & PEDESTRiAN MASTER PLAN ~ 9 <br />East 14th Street South Area Development Strategy (2004) <br />San Leandro Complete Streets Policy (2013) <br />San Leandro Downtown Design Guideline (2007) <br />Bicycle and Pedestrian Design Guideline (2007) <br />Downtown San Leandro Transit-Oriented Development Strategy (2007) <br />MacArthur Boulevard Streetscape Master Plan (2001) <br />City of San Leandro Municipal Code <br />Regional <br />San Francisco Bay Trail Plan Summary (2015) <br />San Francisco Bay Trail Design Guide (2016) <br />San Leandro Creek Master Plan (2017) <br />Alameda County Bicycle Plan (Alameda County, 2012) <br />A Downtown San Leandro crosswalk near the San Leandro BART Station. <br />Bicycling and walking are healthy, sustainable, and lower cost forms of <br />transportation that can be ideal for many trips. in 1997, the City of San <br />Leandro adopted a Bicycle Master Plan to set forth a blueprint for completing <br />a system of bikeways, support facilities (such as bicycle parking) and education <br />programs. This document was previously updated in 2004 and 2010 to reflect <br />changes in the bicycling environment since the previous document and, also, <br />to add a pedestrian component. <br />This document comprises the 2018 update to the Bicycle and Pedestrian <br />Master Plan. The Bicycle and Pedestrian Master Plan (Plan) is the official <br />policy document guiding the development of policies and facilities to enhance <br />bicycling and walking as practical, efficient, and safe transportation choices <br />for San Leandro residents, workers, and visitors. it is divided into six chapters <br />that address existing bicycling and walking conditions, goals and policies, the <br />recommended bicycle network and pedestrian improvement areas, safety, <br />education, enforcement, and a plan to guide implementation. <br />Relationship to Other Plans <br />A number of current documents were reviewed and summarized to identify <br />policies related to bicycling and walking in San Leandro. These documents <br />included a mix of local, state, regional and federal sources as listed below. <br />Appendix A contains additional details on each of these sources. <br />Plans, laws and policies that were reviewed as a part of the update of this <br />Bicycle and Pedestrian Master Plan are listed below: <br />Local <br />San Leandro 2035 General Plan (2016) <br />San Leandro Bicycle and Pedestrian Master Plan (2010) <br />San Leandro Next Generation Workplace Districts (2013) <br />San Leandro BART Station Access Plan (BART, 2002) <br />Introduction <br />147
The URL can be used to link to this page
Your browser does not support the video tag.