My WebLink
|
Help
|
About
|
Sign Out
Home
5B Public Hearings 2018 0319
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0319
>
5B Public Hearings 2018 0319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:25:31 AM
Creation date
3/14/2018 11:25:09 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/19/2018
Retention
PERM
Document Relationships
Reso 2018-021
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Reso 2018-022
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
234 ~ CiTY OF SAN LEANDRO BiCYCLE & PEDESTRiAN MASTER PLAN <br />Recommended High-Visibility Crosswalk/ Pedestrian Scramble <br />Recommended NoRight Turn Blankout Sign <br />Recommendations onCity Property Recommendations onSchool District Property <br />Recommended “KeepClear” Striping <br />Recommended Green15-minute Parking Curb <br />RecommendedRed Curb <br />Recommended GreenConict Striping for Bike Lane <br />Recommended Planterto Minimize Tripping Hazard <br />Recommended “No Pick-upor Drop-o” Signage <br />P <br />KEEPCLEAR <br />NO <br />Pick-uporDrop-o CLEARKEEPP <br />NOPick-uporDrop-o <br />## <br />Estudillo <br /> <br />A <br />v <br />e <br />n <br />u <br />e <br />Callan Av <br />e <br />n <br />u <br />eLee AvenuePala Avenu <br />e <br />Bancro <br />ft <br /> AvenueSan Jose <br /> Stree <br />t <br />Bridge Ro <br />a <br />d <br />Collier Dri <br />v <br />e <br />Rodney D <br />r <br />i <br />v <br />e <br />Joaquin <br />A <br />v <br />e <br />n <br />u <br />eBancrof <br />t <br /> Avenue <br />Bancroft <br />Middle <br />School <br />A <br />A <br />BB <br />5 <br />6 <br />6 <br />5 <br />4 <br />4 <br />3 <br />3 <br />2 <br />1 <br />1 <br />Callan Avenue / Parking Lot Entrance- Stripe “KEEP CLEAR” in area in front of driveway and paint curbs red adjacent to driveway <br />Bancroft Avenue / Callan Avenue- Place planter to reduce tripping hazard at back of existing curb ramp- Upgrade existing crosswalks to high visibility crosswalks- Consider installing pedestrian scramble and illuminated no-right-turn blank out signs at northwest and southwest corners- Install green dashed bike lane markings at intersections, major driveways, and conflict areas on Bancroft Avenue <br />Parking Lot Fence- Add “No Pick-up or Drop-o” signage to parking lot fence <br />Bancroft Avenue / Estudillo Avenue- Install red curb at northeast side of Bancroft Avenue immediately adjacent to intersection- Install green 15 minute parking curb for 2 car-lengths to the north of red curb- Consider installing pedestrian scramble and illuminated no-right-turn blank out signs at all corners- Install high visibility crosswalks at all legs- Extend existing white curb on Estudillo Aveue east of Bancroft Avenue 3 car-lengths to the southwest- An R3-1 “No Right Turn” activated blank out sign should be installed facing WB trac on Estudillo Avenue at Bancroft Avenue to prevent right turning movements onto Bancroft when students are using the pedestrian crosswalk. As a less-expensive interim measure, install an R10-15 “Turning Vehicles Yield to Pedestrians” or an R13A (CA) “No Right Turn on Red” sign <br />Estudillo Avenue / School Frontage (Long Term Options) <br />Option A, Drop-o / Pick-up Zone:- Using landscaping area from school, install a drop-o pull in for cars (getting out of the way of through trac) where they can safely drop-o/ pick-up or wait for their children. The pull-in should be designed with a continuous sidewalk along the back end connecting to existing path in the front of the school. The existing sidewalk along the street should also be re-designed, with special care given to the driveway crossings. <br />Option B: Incorporate Teacher / Sta Parking into Future Development:- As a part of the proposed redevelopment of this site, consider asking the developer to build/ allot a collection of parking spaces that school faculty and sta can use as a part of the development's community benefits package. <br />Estudillo Avenue / San Jose Street- Install high visibility crosswalk at west leg- Consider installing rectangular rapid flashing beacons at northwest and southwest corners- Install green dashed bike lane markings at intersections, major driveways, and conflict areas on Estudillo Avenue <br />2 <br />Bancroft Middle SchoolSan Leandro <br />Safe Routes to Schools Improvement Plan <br />Site Assessment held March 2017 <br />0 200 ftImprovements not to scale <br />The above items are recommendations only and based on Safe Routes to Schools site assessment best practices. Feasibility determination, final design, accessibility, funding, and implementation of any recommended improvements is the responsibility of the appropriate governing agency. <br />Appendix G: Safe Routes to Schools Improvement Plans <br />372
The URL can be used to link to this page
Your browser does not support the video tag.