Laserfiche WebLink
240 ~ CiTY OF SAN LEANDRO BiCYCLE & PEDESTRiAN MASTER PLAN <br />AHEAD <br />E <br />u <br />c <br />l <br />i <br />d <br /> Co <br />u <br />r <br />t <br />Dutto <br />n <br />A <br />v <br />e <br />n <br />u <br />e Maple <br /> Cou <br />r <br />t <br />Holma <br />n <br />C <br />o <br />urtEa <br />s <br />t <br /> <br />14 <br />t <br />h <br /> S <br />t <br />r <br />e <br />e <br />t <br />Euclid <br />A <br />v <br />e <br />n <br />u <br />e <br />Georgia <br />W <br />a <br />y <br />B <br />r <br />ee <br />d <br /> A <br />v <br />e <br />n <br />u <br />e <br />Dowling BoulevardSunnysi <br />d <br />e <br />Dri <br />v <br />e <br />Washington <br />Elementary <br />School <br />Recommended High-Visibility Crosswalk <br />Recommended Advance Yield Markings <br />Recommended Curb Extension <br />Existing CrossingGuard <br />Existing Speed Feedback Sign <br />Recommended Red Curb <br />Recommended White Curb <br />RecommendedR25D Signage <br />Recommended R9-3bP"Use Crosswalk" Signage <br />Recommended R3-4“No U-Turn” Signage <br />Recommended Transverse Crosswalk <br />Non-infrastructure Recommendation <br />- Establish “Rolling Drop-o” program, in which parent/community volunteers open car doors and help children exit vehicles in order to expedite the drop-o process <br />Long-Term Recommendation <br />- Consider constructing a small parking lot for school faculty and sta as a long-term capital improvement in order to free up parking space for parents and visitors <br />0 200 ftImprovements not to scale <br />Existing SchoolAccess Point <br />Recommended School Assembly B or DB DAHEAD <br />East 14th Street / Dutton Avenue- Install high visibility crosswalks at all 4 legs- Ensure that future intersection updates support bike and pedestrian safety with elements including curb extensions and pedestrian countdowns <br />Dutton Avenue / Holman Court- Install transverse crosswalk at southeast leg <br />Dutton Avenue / Euclid Court- Install high visibility crosswalk across Euclid Court <br />Dutton Ave. / Dowling Blvd. / Maple Ct.- Install 20’ lengths of red curb on northwest side of Dowling Boulevard adjacent to crosswalk- Install advance yield markings at either side of Dutton Avenue crosswalk- Install high visibility crosswalk across Maple Court- Consider curb extension at southeast corner of Dutton Avenue and Maple Court- Check visibility of stop sign on northwest side of Dowling Boulevard north of crosswalk- Install high visibility crosswalk at north leg of Breed Avenue and Dutton Avenue <br />Dowling Boulevard / Breed Avenue- Install 2 sets of advance yield markings at northeast corner where shown- Install R9-3bP "Use Crosswalk" signage at school frontage (sign should face building)- Long Term:- Consider squaring o the intersection of Breed/Dowling/Dutton to reduce conflicts and improve visibility- Consider removing Breed/Dowling slip-lane to reduce conflicts and improve visibility <br />Breed Avenue / School Frontage- Install R3-4 “No U-Turn” signage along Breed Avenue- Install white curb where shown and install R25D “School Loading and Unloading” signs. Open the gate along Breed Avenue during arrival and dismissal times- Consider sidewalk markings or detectable warning surface at accessible parking driveway to warn pedestrians of vehicles entering and exiting the accessible parking area <br />School Zone- Upgrade existing school zone and School Assembly signs on Dutton Avenue and Dowling Boulevard to current CA-MUTCD standards <br />6 <br />6 <br />5 <br />5 <br />4 <br />4 <br />3 <br />3 <br />2 <br />2 <br />1 <br />1 <br />The above items are recommendations only and based on Safe Routes to Schools site assessment best practices. Feasibility determination, final design, accessibility, funding, and implementation of any recommended improvements is the responsibility of the appropriate governing agency. <br />Washington Elementary SchoolSan Leandro <br />Safe Routes to Schools Improvement Plan <br />Site Assessment held April 2017 <br />378