My WebLink
|
Help
|
About
|
Sign Out
Home
5B Public Hearings 2018 0319
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0319
>
5B Public Hearings 2018 0319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:25:31 AM
Creation date
3/14/2018 11:25:09 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/19/2018
Retention
PERM
Document Relationships
Reso 2018-021
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Reso 2018-022
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
24 ~ CiTY OF SAN LEANDRO BiCYCLE & PEDESTRiAN MASTER PLAN <br />The new Tech Campus is located directly behind the San Leandro BART Station. The first <br />building opened in 2017. These developments are bringing more office jobs to downtown <br />San Leandro. <br />Greenhouse Marketplace Shopping Center: Greenhouse Marketplace is a <br />local shopping destination located adjacent to the i-580 and i-238 interchange. <br />Greenhouse Marketplace includes a Safeway, Longs Drugs and a number of <br />smaller chain businesses. <br />Marina Square Center: Marina Square is a large shopping center located east <br />of i-880 at the Marina Boulevard exit. Marina Square has a number of large- <br />scale retail outlets, including Nordstrom Rack, Gap and Old Navy. <br />Marina Auto Mall: Many of the city's auto dealerships are along Marina <br />Boulevard in the area around the Marina Square Center. <br />MAJOR EMPLOYMENT CENTERS <br />San Leandro has a very strong employment base. Traditionally this base has <br />been comprised of food service and manufacturing businesses. Recently, <br />due to its convenient location to freeways, major roadways, and transit, the <br />City has attracted more office/high-tech businesses. There are two large <br />manufacturing and industry areas, west San Leandro and south of Marina <br />Boulevard, which house a number of large-scale businesses. These areas have <br />not typically been priority areas for pedestrian or bicycle improvements and <br />need improvement. Creekside Plaza is a multiple-building complex with over <br />234,000 square feet of office space located at the corner of Davis Street and <br />San Leandro Boulevard. This complex was strategically located adjacent to <br />the downtown San Leandro BART Station to encourage transit ridership. <br />Earlier in 2017, a new tech office complex opened directly behind the BART <br />Station, further increasing the amount of transit-oriented offices. A second, <br />neighboring building, is currently under construction. <br />Hospitals are a significant source of employment to any community. San <br />Leandro has the San Leandro Hospital campus of Eden Medical Center located <br />on East 14th Street at 138th Avenue and a new Kaiser Hospital on Merced <br />Street between Marina Boulevard and Fairway Drive. Based on San Leandro's <br />Next Generation Workplace Study, Merced Street is slated to become the <br />focal point of a new business center; connecting the Westgate Center, Marina <br />Square, Kaiser Medical Center, and any future developments in the area of the <br />city. <br />Figure 6 display’s San Leandro’s employment density overlaid with its activity <br />generators. <br />162
The URL can be used to link to this page
Your browser does not support the video tag.