My WebLink
|
Help
|
About
|
Sign Out
Home
5B Public Hearings 2018 0319
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0319
>
5B Public Hearings 2018 0319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:25:31 AM
Creation date
3/14/2018 11:25:09 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/19/2018
Retention
PERM
Document Relationships
Reso 2018-021
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Reso 2018-022
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
48 ~ CiTY OF SAN LEANDRO BiCYCLE & PEDESTRiAN MASTER PLAN <br />Class II Bicycle Lanes and Buffered Bicycle Lanes <br />Class ii facilities are on-street bike lanes. These can be a standard size <br />(minimum 5-feet wide), but can also be enhanced with a painted buffer added <br />to the side of the lane for a higher perception of safety or with green paint for <br />higher visibility. The figures below show a standard Class ii bike lane as well as <br />a buffered bike lane. There are currently 23.2 miles of Class ii bicycle lanes and <br />1.3 miles of Class ii buffered bicycle lanes in San Leandro. <br />A buffered bicycle lane on Floresta Boulevard. <br />Standard Class II bicycle lanes. <br />Class II bicycle lanes with a buffer. The buffer can be installed in various configurations. <br />186
The URL can be used to link to this page
Your browser does not support the video tag.