My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent Calendar 2018 0319
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0319
>
8G Consent Calendar 2018 0319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:25:34 AM
Creation date
3/14/2018 11:25:33 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/19/2018
Retention
PERM
Document Relationships
Reso 2018-023
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 18-117 <br />The total project cost is undetermined at this time; however, it could be as high as $6,000,000 if <br />the remaining soil is hauled to a Class 1 disposal facility. <br />Design and Bid:$ 200,000 <br />Hauling of dirt:$5,600,000 <br />Construction Management and Inspection: $ 200,000 <br />Total: $6,000,000 <br />Budget Authority <br />Account No. Reso No, Appropriation Dates & Source Amount <br />593-52-229 14-005, January 21, 2014, WPCP Enterprise Fund $2,650,000 <br />PREPARED BY: Nick Thom, City Engineer, Engineering and Transportation Department <br />Page 3 City of San Leandro Printed on 3/13/2018 <br />436
The URL can be used to link to this page
Your browser does not support the video tag.