My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent Calendar 2018 0416
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0416
>
8D Consent Calendar 2018 0416
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 11:26:58 AM
Creation date
4/10/2018 11:26:58 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
4/16/2018
Retention
PERM
Document Relationships
Reso 2018-028
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 18-135 <br />City of San Leandro <br />In-House Streets Maintenance - FY 2019 <br />·Adason Drive (Residential; PCI 7) - Between Halcyon Dr. to Hesperian Blvd., placement <br />of thin overlay of travel lane and crack-seal surface. Work anticipated to increase PCI by <br />30-45 points, extending life additional 4-5 years. (Note: This work was rolled over from the <br />FY 18 list). <br />·Coburn Court (Residential; PCI 24) - Between parking lot to end of cul-de-sac, remove <br />and replace all distressed pavement and crack seal surface. Work anticipated to increase <br />PCI to 100, extending life additional 20+ years. <br />·Sherry Court (Residential; PCI 25) - Between Benedict Dr. to end of cul-de-sac, remove <br />and replace all distressed pavement and crack seal surface. Work anticipated to increase <br />PCI to 90, extending life additional 20+ years. <br />·Hillside Drive (Residential; PCI 26) - Between Daily Dr. to Montrose Dr., remove and <br />replace all distressed pavement and crack seal surface. Work anticipated to increase PCI <br />to 100, extending life additional 20+ years. <br />·Sylvia Way (Residential; PCI 85) - Between Dilletta Ave. to Sidney Ave., crack seal <br />surface from end to end. Work anticipated to increase PCI to 94, extending life additional <br />4-5 years. <br />·Fairway Drive (Collector/Arterial; PCI 90) - Between Doolittle Dr. to 880 Overpass, crack <br />seal surface from end to end. Work anticipated to increase PCI to 96, extending life <br />additional 4-5 years. <br />·Andover Street (Residential; PCI 95) - Between Lewelling Blvd. to Burkhart Ave., crack <br />seal surface from end to end. Work anticipated to increase PCI to 96, extending life <br />additional 4-5 years. <br />·Duzmal Avenue (Residential; PCI 85) - From Faris St. to cul-de-sac of Kramer St., crack <br />seal surface from end to end. Work anticipated to increase PCI to 94, extending life <br />additional 4-5 years. <br />·Foothill Blvd. (Collector; PCI 86) - Between Durant Ave. to Macarthur Blvd., crack seal <br />surface from end to end. Work anticipated to increase PCI to 95, extending life additional <br />4-5 years. <br />·Bigge Street (Residential; PCI 99) - Between Adams Ave. to end of cul-de-sac, crack <br />seal surface from end to end. Work anticipated to increase PCI to 100, extending life <br />additional 4-5 years. <br />Page 4 City of San Leandro Printed on 4/10/2018 <br />57
The URL can be used to link to this page
Your browser does not support the video tag.