My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Develop conceptual drawings for streetscape improvements along the subject section of East 14th Street. Proposed <br />improvements include median enhancements, widening sidewalks with bulb-outs, enhancing crosswalks and <br />installing street trees. <br />Description <br />The project involves the completion of conceptual plans and 30% construction drawings for pedestrian street <br />improvements along the section of East 14th Street extending from 136th Avenue to the southern City Limit in <br />accordance with the East 14th Street South Area Development Strategy dated April 2004. This project will have a <br />series of public meetings as necessary to develop a project scope. Pedestrian improvements may consist of the <br />following; widening sidewalks with bulb-outs, enhancing crosswalks and upgrading sidewalk ramps to current <br />standards, infilling with new street trees and tree grates as needed, installing pedestrian oriented street lights, <br />adding street furniture, creating place-making elements, and installing enhanced bus stops and shelters. The <br />purpose of this CIP project is to define a viable project and develop accurate cost estimates. This information will be <br />used for future CIP project requests and grant funding as appropriate. <br />Justification or Benefit of Project <br />This project will create a more pedestrian-friendly environment on E. 14th Street. The planned improvements will <br />increase the safety of pedestrians and encourage walking and biking, which are healthy transportation choices. <br />Businesses will also benefit from the enhanced environment and private investment is likely to increase. This project <br />is a priority one pedestrian project in the 2010 Bicycle and Pedestrian Master Plan. <br />Consequences of not doing the Project <br />Safety will not be improved. The area along E. 14th Street could potentially decline, including increased vacancy and <br />blight. Less private investment will be drawn to the area. <br />Project Numb 2012.0120Project Typ Roadway streetscape <br />Detailed Cost $410,000 Status Active <br />Department/Sponsor Community Development <br />Impact to Operation Cost Impact to Maintenance Cost Increase <br />Likely Cost <br />Categor Bicycle and Pedestrian <br />Project Name E14th Pedestrian Imp 136th-S City Limit <br />122
The URL can be used to link to this page
Your browser does not support the video tag.