My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Install landscaped medians on East 14th street from 145th Ave to the Southern City Limit near Bayfair Mall. <br />Description <br />Streetscape median improvements along the section of East 14th Street from 145th Avenue to the Southern City <br />Limit. The project will extend median improvements installed from 136th to 144th Avenues in 2010 southward to the <br />City limits. Project will remove existing pavement and install raised median for landscaping where practical. Several <br />public meetings will be held to determine the exact configuration of median locations. New medians will include <br />palm accent trees with low water / maintenance shrubs, decomposed granite, concrete pavers and colored concrete <br />banding. New medians will include irrigation with a smart clock and a fiber connection. New medians will be <br />designed per Bay Friendly guidelines. Sidewalk ramps will be upgraded for compliances with current ADA <br />requirements at all intersections, concrete bulb outs may be installed if feasible. Existing lane striping and <br />crosswalks within the project limits will be replaced. <br />Justification or Benefit of Project <br />The East 14th Street South Area Development Strategy recommends this project to create a more pedestrian-friendly <br />environment on East 14th Street, thereby supporting retail businesses and services and encouraging walking and <br />biking, which are healthy alternative modes of transportation. This project is a priority one pedestrian project in the <br />2010 Bicycle and Pedestrian Master Plan. <br />Consequences of not doing the Project <br />Continued challenges in attracting private investment and new businesses to this area, which includes blighted and <br />underutilized parcels. Benefits to safety and health will not be realized. <br />Project Numb 2005.0100Project Typ Roadway streetscape <br />Detailed Cost $3,855,000 Status Active <br />Department/Sponsor Community Development <br />Impact to Operation Cost Impact to Maintenance Cost Increase <br />Likely Cost <br />Categor Bicycle and Pedestrian <br />Project Name E14th St Medians - 145th to S City Limit <br />123
The URL can be used to link to this page
Your browser does not support the video tag.