My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Install HAWK pedestrian signal at the intersection of East 14th Street and 144th Ave. <br />Description <br />Install HAWK pedestrian signal at the intersection of East 14th Street and 144th Ave. <br />Justification or Benefit of Project <br />A high volume of pedestrians cross the four lane road at this location. A pedestrian signal will increase the safety of <br />the crossing. <br />Consequences of not doing the Project <br />Without this project the existing condition will remain. <br />Project Numb 2019.5615Project Typ Traffic and Pedestrian - Contr <br />Detailed Cost $204,700 Status Funded CIP <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Neutral Impact to Maintenance Cost Increase <br />Likely Cost <br />Categor Bicycle and Pedestrian <br />Project Name East 14th / 144th Pedestrian Signal <br />124
The URL can be used to link to this page
Your browser does not support the video tag.