My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Convert existing overhead utilities to underground. <br />Description <br />Relocate existing PG&E, AT&T, Comcast, and City facilities from the current location on poles to new conduits <br />underground. Project limits are East 14th Street from Thornton Ave to 150th Ave. AT&T and Comcast will fund their <br />own work. PG&E work will be funded by a combination of Rule 20A money collected from ratepayers within the City <br />and Underground Utility in lieu fees collected by the City. City work will be funded by a combination of Underground <br />Utility in lieu fees, gas taxes, and Measure B pass through funds. The total cost of the City's work is approximately <br />$4.8M including a $1.6M contribution toward PG&E's work. The amount of Rule 20A money available for this project <br />is expected to increase which will reduce the City's contribution toward PG&E's work. The City has already <br />appropriated $3M toward this project, this allocation brings the total to $3.2M. <br />Justification or Benefit of Project <br />This is the last segment of East 14th Street within the City with overhead utility lines. Undergrounding of utilities <br />removes poles from the sidewalk which creates more space for pedestrians. <br />Consequences of not doing the Project <br />Without this project the utilities will remain as they are. <br />Project Numb 2003.0985Project Typ Utility Undergrounding <br />Detailed Cost $4,800,000 Status Funded CIP <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Neutral Impact to Maintenance Cost Increase <br />Likely Cost <br />Categor Other <br />Project Name East 14th Underground Utility <br />131
The URL can be used to link to this page
Your browser does not support the video tag.