Laserfiche WebLink
Summary <br />This project will complete necessary code improvements to the pool facility as detailed in the Facility Evaluation by <br />Aquatic Design Group (January 2002). <br />Description <br />This project will complete necessary code improvements to the pool facility as detailed in the Facility Evaluation by <br />Aquatic Design Group (January 2002). <br />Improvements include: Removal of wall dividing the deep and shallow areas. Farrelly pool has an 8-inch wide <br />dividing wall separating the two areas into two sections in violation of Title 24, Chapter 31B (page 22 of 56 in the <br />2002 Facility Evaluation). -Convert the current water heaters to a tank less water heater system. -Move the chemicals <br />stored outside to inside of the pump room. <br />Justification or Benefit of Project <br />This project is required to meet the codes of the County Health Department. <br />Consequences of not doing the Project <br />Without this project the County could close the pool. <br />Project Numb 2003.0050Project Typ Pools <br />Detailed Cost Status Retired <br />Department/Sponsor Recreation & Human Servic <br />Impact to Operation Cost Neutral Impact to Maintenance Cost Decrease <br />Likely Cost $800k to $1.6M <br />Categor Parks and Open Space <br />Project Name Farrelly Pool Refurbishment <br />144