Laserfiche WebLink
Summary <br />Reconstruct Farrelly Pool including replacement of the mechanical system and modification of the restroom facilities <br />as required to meet code. <br />Description <br />Reconstruct Farrelly Pool including replacement of the mechanical system and modification of the restroom facilities <br />as required to meet code. <br />Justification or Benefit of Project <br />This outdoor pool is operated seasonally and is very popular with the residents. Note that the pool and locker room <br />are located on school district property and operated by the City under an agreement with the school district. <br />Consequences of not doing the Project <br />Pool is currently closed and will remain closed. <br />Project Numb 2018.3420Project Typ Pools <br />Detailed Cost $3,500,000 Status Active <br />Department/Sponsor Recreation & Human Servic <br />Impact to Operation Cost Neutral Impact to Maintenance Cost Significant Increase <br />Likely Cost <br />Categor Parks and Open Space <br />Project Name Farrelly Pool Replacement <br />145