My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Design of a project to stabilize Lake Chabot Road between Chabot Terrace and Astor Drive. <br />Description <br />The ground beneath Lake Chabot Road between Chabot Terrace and Astor Drive (approximately 2100 linear feet) is <br />creeping downward toward the creek. Over many years, sections of the down slope side of this road have continually <br />depressed, causing material sloughing and creating longitudinal fissures in the roadway; additionally, storm water <br />runoff has caused various degrees of erosion to the down slope hillside. A 2011 geotechnical investigation study <br />determined that fill slope creep will continue and that new shallow landslides could be triggered by excessive <br />precipitation or ground shaking. Two repair options were suggested: 1. Stitch Pier Retention System, 2. Re-grading <br />the site with engineered fill properly keyed and benched into the bedrock. Additionally, improvements to surface <br />water control should be addressed to minimize erosion. The construction of the project will be at a future phase. <br />Justification or Benefit of Project <br />Chabot road carries approximately 3300 vehicles per day. Without preventative work this road will eventually fail and <br />these vehicles will be detoured through the Bay-O-Vista neighborhood. <br />Consequences of not doing the Project <br />Without this project the City will continue to fund road repairs as the hill side moves. If the slope fails and moves <br />suddenly down toward the creek, the costs to rebuild the road will be significantly higher than the cost to prevent <br />failure. <br />Project Numb 2009.0030Project Typ Roadway pavement <br />Detailed Cost $260,000 Status Funded CIP <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Neutral Impact to Maintenance Cost Neutral <br />Likely Cost <br />Categor Roadways for vehicles <br />Project Name Lake Chabot Road Stabilization Design <br />156
The URL can be used to link to this page
Your browser does not support the video tag.