Laserfiche WebLink
Summary <br />Improvements such as a median with fence at Lewelling Blvd and Tropic Court to channelize pedestrians into the <br />crosswalk. <br />Description <br />Improvements such as a median with fence at Lewelling Blvd and Tropic Court to channelize pedestrians into the <br />crosswalk. <br />Justification or Benefit of Project <br />This segment of Lewelling Blvd carries 22,600 vehicles per day according to 2014 counts and has a higher than <br />average vehicle/pedestrian collision rate. <br />Consequences of not doing the Project <br />Without this project there will be no improvement in pedestrian safety at this intersection. <br />Project Numb 2018.5620Project Typ Traffic and Pedestrian - Contr <br />Detailed Cost Status Active <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Impact to Maintenance Cost Increase <br />Likely Cost $200k to $400k <br />Categor Traffic Safety <br />Project Name Lewelling / Tropic Pedestrian Imp <br />157