My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Relocate existing utilities on Marina Blvd from Merced to Neptune from overhead to underground. <br />Description <br />This is related of the Marina Blvd Streetscape project, project 2012.0131 and 2012.0132. Design, Bid, and Construct <br />facilities for underground utilities. Relocate existing utilities from overhead to underground and remove existing utility <br />poles. <br />Justification or Benefit of Project <br />Marina Boulevard is the gateway to the City's shoreline but the narrow sidewalks are cluttered with utility poles. <br />Consequences of not doing the Project <br />Without this project existing utility poles will remain in the sidewalks of Marina Boulevard. <br />Project Numb 2018.5800Project Typ Utility Undergrounding <br />Detailed Cost Status Active <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Impact to Maintenance Cost Increase <br />Likely Cost >$6.4M <br />Categor Underground Utilities <br />Project Name Marina Blvd Underground Utilities <br />172
The URL can be used to link to this page
Your browser does not support the video tag.