Laserfiche WebLink
Summary <br />Relocate existing utilities on Marina Blvd from Merced to Neptune from overhead to underground. <br />Description <br />This is related of the Marina Blvd Streetscape project, project 2012.0131 and 2012.0132. Design, Bid, and Construct <br />facilities for underground utilities. Relocate existing utilities from overhead to underground and remove existing utility <br />poles. <br />Justification or Benefit of Project <br />Marina Boulevard is the gateway to the City's shoreline but the narrow sidewalks are cluttered with utility poles. <br />Consequences of not doing the Project <br />Without this project existing utility poles will remain in the sidewalks of Marina Boulevard. <br />Project Numb 2018.5800Project Typ Utility Undergrounding <br />Detailed Cost Status Active <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Impact to Maintenance Cost Increase <br />Likely Cost >$6.4M <br />Categor Underground Utilities <br />Project Name Marina Blvd Underground Utilities <br />172