Laserfiche WebLink
Summary <br />Widen Marina Boulevard from Teagarden Street to Alvarado Street <br />Description <br />Obtain right of way, design, and construct roadway improvements to increase vehicle capacity on Marina Boulevard <br />from Teagarden Street to Alvarado Street <br />Justification or Benefit of Project <br />Marina Boulevard between Teagarden and Alvarado is two lanes each direction. The City’s 1988 Master Plan of City <br />Streets identifies the need for a third eastbound lane to accommodate heavy eastbound evening peak traffic. The <br />completed project will not only improve the level of service on Marina Blvd but also allow vehicles to enter and exit <br />I-880 easier. <br />Consequences of not doing the Project <br />Without this project the capacity of the road will remain as it is today. <br />Project Numb 2018.4000Project Typ Roadway pavement <br />Detailed Cost Status Active <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Impact to Maintenance Cost <br />Likely Cost $3.2M to $6.4M <br />Categor Roadways for vehicles <br />Project Name Marina Blvd Widen Teagarden to Alvarado <br />173