My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Widening of the existing boat launch ramp, upgrading the docks (and including lower-entry point(s) for <br />kayaks/canoes, upgrades to the parking lot such as new lighting, upgrades to the restroom, and preparation of a <br />DBW grant application for this work. <br />Description <br />Preparation of contract documents, competitive bidding, and construction as follows for the boat launch ramp at the <br />Marina: Widen the existing boat concrete launch ramp to allow wider access for boats to enter and exit the water. <br />Replacement of the existing floating dock and piers with a dock that features a lower entry point for kayaks and <br />canoes. Replace and add new light standards to increase lighting in the parking lot. Rehabilitate the existing public <br />restroom to match Cal-Coast architectural design. The project is eligible for Department of Boating and Waterways <br />(DBW) grant funding. The project budget includes preparation of the DBW application and a feasibility report. The <br />grant application requires a legal description of the project area, cost estimate, scope of project, list of restricted <br />uses, engineering feasibility study, launch fees, economic justification and analysis, and photographs. Grant funding <br />approval process is approximately 2.5 years based on the DBW application schedule. <br />Justification or Benefit of Project <br />The development project being proposed by Cal Coast includes a major redevelopment of most of the land in the <br />immediate vicinity of the boat launch ramp, but does not include any upgrades to the ramp itself. If approved, the <br />immediate vicinity would have a new aquatic center and small office building, with more of the public anticipated to <br />utilize the boat launch ramp. Upgrading the ramp would integrate well with the proposed land-side development, <br />complimenting the proposed new uses. The DBW grant allows for rehabilitation to existing boat launch facilities <br />(including the general area that the launch is located). Staff would propose to replace the existing docks and include <br />a new low-entry point for kayaks/canoes; replace rip-rap on either side of the ramp; possibly widen the ramp so that 2 <br />boats could launch simultaneously; replace the fish cleaning station; and upgrade the restroom facilities <br />Consequences of not doing the Project <br />The proposed land-side development is anticipated to have a larger draw of the public to this area. It would be ideal <br />to have an upgraded public boat launch ramp to compliment all of the other new development in the immediate <br />vicinity. If the grant submit <br />Project Numb 2014.0400Project Typ Marina and Shoreline <br />Detailed Cost $2,330,000 Status Retired <br />Department/Sponsor Public Works <br />Impact to Operation Cost Impact to Maintenance Cost <br />Likely Cost <br />Categor <br />Project Name Marina Public Boat Launch Ramp Improve <br />184
The URL can be used to link to this page
Your browser does not support the video tag.