Laserfiche WebLink
Summary <br />Replace existing traffic circle and with permanent construction. <br />Description <br />The traffic circle and traffic channelization that was installed with striping, dura-curb, and delineators has dramatically <br />reduced accidents at this intersection. This project will replace these temporary elements with permanent <br />construction such as concrete. Work will include the traffic circle, two bulb outs, striping, and signage. <br />Justification or Benefit of Project <br />Consequences of not doing the Project <br />Project Numb 2018.5640Project Typ Traffic and Pedestrian - Contr <br />Detailed Cost Status Active <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Impact to Maintenance Cost <br />Likely Cost $200k to $400k <br />Categor Traffic Safety <br />Project Name SLB Broadmoor Traffic Circle <br />224