Laserfiche WebLink
Summary <br />Replace irrigation and landscaping on San Leandro Boulevard from Williams St to East 14th Ave. <br />Description <br />Work includes replacement of irrigation systems or installation of new irrigation systems including installation of a <br />smart clock with a fiber communication connection. Replacement of landscaping to meet Bay Friendly standards; soil <br />will be replaced or amended if possible. <br />Justification or Benefit of Project <br />Maintenance is increasing and plant health is suffering due to soil compaction and the age of the irrigation system. <br />This project will restore an attractive appearance to this recently paved roadway. <br />Consequences of not doing the Project <br />Without this project maintenance requirements will continue to increase, plant health will continue to decline. <br />Project Numb 2018.4480Project Typ Roadway streetscape <br />Detailed Cost Status Active <br />Department/Sponsor Public Works <br />Impact to Operation Cost Impact to Maintenance Cost Increase <br />Likely Cost $200k to $400k <br />Categor Bicycle and Pedestrian <br />Project Name SLB Median Rehab Williams to E14th <br />225