Laserfiche WebLink
<br /> <br />Comments: <br /> <br />City Street Maintenance <br />Funding for repair and replacement of City streets including pavement, base, sub-base, <br />drainage, and ADA upgrades triggered by adjacent work. <br /> <br />Completed in the last two years: <br /> <br />In Progress: <br />Design of Street Sealing 2016-17 $1,500,000 <br />Design of Street Overlay/Reconstruction 2016-17 $5,965,000 <br />Bidding Street Sealing 2015-16 $1,200,000 <br />Bidding Street Overlay and Reconstruction 2015-16 $1,700,000 <br />Awarded ADA ramps triggered by both projects $1,000,000 <br /> <br />Future projects: <br />Street sealing 2017-18 <br />Street sealing 2018-19 <br />Street overlay and reconstruction 2016-17 <br />Street overlay and reconstruction 2017-18 <br /> <br />Comments: Current backlog of maintenance is approximately $100M. Annual <br />funding in the amount of $7.5M is needed to maintain our current system and prevent <br />the backlog from growing. City has seen a slight reduction in street repair costs due to <br />the use of rubberized cape seals and cement treated soil. Additional innovations may <br />further reduce costs but aren’t likely to significantly impact the magnitude of our <br />backlog. There is no known funding source for the backlog work and thus it is highly <br />desirable to prevent the backlog from growing. <br /> <br /> <br /> <br /> <br />43