Laserfiche WebLink
<br /> <br />walkways, and parking lots. Buildings located within parks excluding pool locker <br />rooms and recreation centers are maintained through this fund. <br /> <br />Completed in the last two years: <br />Thrasher Park Play equipment and fencing <br />The Siempre Verde Park reconstruction project, while not a maintenance project, <br />replaced several facilities that were in need of maintenance. <br /> <br />In Progress: <br />None <br /> <br />Future projects: <br />Bonaire Park Parking lot drainage <br />Bonaire Park Picnic Area Renovation <br />Cherry Grove Park Parking Lot <br />Cleveland Park Play Structure <br />Marina Park Play Areas (North and South) <br />Marina Park South Parking Lot <br />Memorial Park Play/Picnic area Renovation <br />SL Ball Park Drainage Irrigation Sod <br />Stenzel Park 1 & 2 Fields Rehabilitation <br />Stenzel Park South Parking Lot Repair <br />Stenzel Park South Play Area <br />Tennis Court Reconstruction <br />Thrasher Park Field Rehabilitation <br />Toyon Park Irrigation Replacement <br />Washington Manor Park Picnic Area Renovation <br />Washington Manor Park Play Areas (Front and Back) <br /> <br />Comments: The Siempre Verde Park renovation that occurred during this review <br />period increased the amount of play structures, sf of restroom building, sf of paving, <br />and other items that must be maintained by the program. The above listed projects <br />represent a maintenance backlog of approximately $8,500,000. The annual funding <br />requested for this program is only sufficient to prevent the backlog from growing. <br />Additional funding will be required to reduce the maintenance backlog. <br /> <br />Sanitary Sewer Collection System Maintenance <br />Funding for repair and replacement of the pipes, pumps, manholes, and other structures <br />that make up the sanitary sewer collection system. <br /> <br />Completed in the last two years: <br /> <br />In Progress: <br /> <br />Future projects: <br /> <br />42