My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />walkways, and parking lots. Buildings located within parks excluding pool locker <br />rooms and recreation centers are maintained through this fund. <br /> <br />Completed in the last two years: <br />Thrasher Park Play equipment and fencing <br />The Siempre Verde Park reconstruction project, while not a maintenance project, <br />replaced several facilities that were in need of maintenance. <br /> <br />In Progress: <br />None <br /> <br />Future projects: <br />Bonaire Park Parking lot drainage <br />Bonaire Park Picnic Area Renovation <br />Cherry Grove Park Parking Lot <br />Cleveland Park Play Structure <br />Marina Park Play Areas (North and South) <br />Marina Park South Parking Lot <br />Memorial Park Play/Picnic area Renovation <br />SL Ball Park Drainage Irrigation Sod <br />Stenzel Park 1 & 2 Fields Rehabilitation <br />Stenzel Park South Parking Lot Repair <br />Stenzel Park South Play Area <br />Tennis Court Reconstruction <br />Thrasher Park Field Rehabilitation <br />Toyon Park Irrigation Replacement <br />Washington Manor Park Picnic Area Renovation <br />Washington Manor Park Play Areas (Front and Back) <br /> <br />Comments: The Siempre Verde Park renovation that occurred during this review <br />period increased the amount of play structures, sf of restroom building, sf of paving, <br />and other items that must be maintained by the program. The above listed projects <br />represent a maintenance backlog of approximately $8,500,000. The annual funding <br />requested for this program is only sufficient to prevent the backlog from growing. <br />Additional funding will be required to reduce the maintenance backlog. <br /> <br />Sanitary Sewer Collection System Maintenance <br />Funding for repair and replacement of the pipes, pumps, manholes, and other structures <br />that make up the sanitary sewer collection system. <br /> <br />Completed in the last two years: <br /> <br />In Progress: <br /> <br />Future projects: <br /> <br />42
The URL can be used to link to this page
Your browser does not support the video tag.