My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Annual funding for evaluation and mitigation of bicycle and pedestrian issues/complaints <br />Description <br />This program funds activities listed in the City’s Bicycle & Pedestrian Master Plan, including the following: <br />Bike-to Work-Day Event: Promote the event to encourage bicycling. Host an Energizer Station at the downtown SL <br />Bart station. <br />Bike Rack Program:Receive requests for bike racks & parking information. Install bike racks in the ROW at <br />appropriate requested locations. <br />Pedestrian & Bicycle Safety Education:Bicycle and Pedestrian Advisory Committee (BPAC) support. <br />Spot Improvements: Install bike related road signs. Design bikeways and pedestrian paths. Install or modify <br />pavement markings & striping to accommodate bicycle traffic on City streets. Install bicycle detection at traffic <br />signals. Design, and construct upgrades to traffic signals, and safety equipment to meet pedestrian accessibility <br />guidelines. <br />This program is funded annually. <br />Justification or Benefit of Project <br />This program promotes bicycling and walking within the City. <br />Consequences of not doing the Project <br />Without this program bicycling and walking through town may be less inviting. <br />Project Numb 2018.0030Project Typ Annual Program/Maintenance <br />Detailed Cost $50,000 Status Active <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Neutral Impact to Maintenance Cost Neutral <br />Likely Cost <br />Categor Annual Programs/Projects <br />Project Name Bike and Ped Support Program <br />72
The URL can be used to link to this page
Your browser does not support the video tag.