Laserfiche WebLink
Summary <br />Improvements to the women's shower room and exterior roll-up doors based on the Facility Evaluation completed by <br />Aquatic Design Group in January 2002. <br />Description <br />Design and construct the following as described in the needs assessment study by Aquatic Design Group, 2002: <br />Provide electrical bonding for pool equipment Add hose bibs on the pool deck Replace lifeguard chair Replace and <br />upsize recirculation piping Replace pool coping and pool decking And Perform a new facility assessment Replace <br />wall and floor tiles in both locker rooms Install push button shower valves in both locker rooms Replace existing lights <br />in the natatorium with LED lights <br />Justification or Benefit of Project <br />The items listed in the needs assessment are code requirements. A new needs assessment will identity any work <br />required by changes in the code since 2002. <br />Consequences of not doing the Project <br />Items listed will not be in compliance with current codes. <br />Project Numb 2003.3440Project Typ Pools <br />Detailed Cost $455,000 Status Funded Other <br />Department/Sponsor Recreation & Human Servic <br />Impact to Operation Cost Impact to Maintenance Cost <br />Likely Cost <br />Categor <br />Project Name Boys and Girls Club Pool Enhancements <br />77