Laserfiche WebLink
Summary <br />Rehabilitate and/or replace locker rooms, water heaters, tempering valves, and roll up doors. <br />Description <br />Rehabilitate Boys and Girls Club Pool Building and Equipment as follows: Correct mold issues at lockers rooms, <br />install new marble on walls and new tile on floors. Replace shower fixtures. Change water heaters to tankless and <br />relocate them into the mechanical room. Move tempering valves into the mechanical room. Replace existing roll up <br />doors adjacent to the pool with storefront windows or French doors. <br />Justification or Benefit of Project <br />Consequences of not doing the Project <br />Project Numb 2018.3410Project Typ Pools <br />Detailed Cost $405,000 Status Active <br />Department/Sponsor Public Works <br />Impact to Operation Cost Neutral Impact to Maintenance Cost <br />Likely Cost <br />Categor Parks and Open Space <br />Project Name Boys and Girls Club Pool Equip & Bldg <br />78