My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Perform maintenance work on Monarch Bay Drive bridge and MacArthur Blvd bridge as recommended by Caltrans <br />bridge inspection reports <br />Description <br />Work generally consists of guardrail, deck, structure, headwall, and embankment repair. Work is currently needed <br />on Monarch Bay Drive Bridge, MacArthur Blvd at San Leandro Creek, and Inverness at Alameda County Flood <br />Control Canal. <br />Justification or Benefit of Project <br />Transportation of goods and services is vital for economic activity. Vehicles and pedestrians rely upon the City's 29 <br />bridges to circulate around town efficiently. Maintenance work keeps these bridges operational. The South abutment <br />of Monarch Bay Drive Bridge has significant erosion, the bank needs to be rebuilt and protected with rip rap. Material <br />is eroding from behind the headwall and causing the approach to the bridge to sink. <br />Consequences of not doing the Project <br />Failure to address maintenance needs in a timely manner will lead to exponentially more expensive repairs. If <br />maintenance is unaddressed for a significant amount of time some bridges may require full or partial closure. <br />Project Numb 2018.1000Project Typ Bridges <br />Detailed Cost $550,000 Status Funded CIP <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Neutral Impact to Maintenance Cost Neutral <br />Likely Cost <br />Categor Roadways for vehicles <br />Project Name Bridge and Embankment Maintenance <br />80
The URL can be used to link to this page
Your browser does not support the video tag.