Laserfiche WebLink
Summary <br />Resurface the existing pool at the Boys and Girls Club <br />Description <br />Resurface the existing pool at the Boys and Girls Club <br />Justification or Benefit of Project <br />Pool resurfacing is required per the Alameda County Environmental Heath Department inspection of August, 2016. <br />The inspector noted that there are bumps on the pool surface where bacteria can form. The inspector recommends <br />this work occur within one year. <br />Consequences of not doing the Project <br />If this project isn't completed by September 2017 the pool will be closed to the public until the resurfacing is <br />completed. Loss in aquatics revenue of approximately $280,000 annually. <br />Project Numb 2018.3400Project Typ Pools <br />Detailed Cost $350,000 Status Funded CIP <br />Department/Sponsor Public Works <br />Impact to Operation Cost Neutral Impact to Maintenance Cost Neutral <br />Likely Cost <br />Categor Parks and Open Space <br />Project Name Boys and Girls Club Pool Resurface <br />79