Laserfiche WebLink
Summary <br />Install bulb outs or other streetscape elements to reduce street width and slow cars. <br />Description <br />Design and construct improvements within the public right of way to reduce the street width and discourage but not <br />prohibit use by vehicles. Improvements may consist of sidewalk bulb outs either at intersections or mid block, traffic <br />circles at intersections, or other features. <br />Justification or Benefit of Project <br />The traffic volume on Dolores Ave is approximately 2500 vehicles per day which is higher than desired on a <br />residential street. <br />Consequences of not doing the Project <br />Without this project the traffic volumes and speed will remain unchanged. <br />Project Numb 2019.4400Project Typ Roadway streetscape <br />Detailed Cost Status Active <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Impact to Maintenance Cost <br />Likely Cost $200k to $400k <br />Categor Bicycle and Pedestrian <br />Project Name Dolores Ave Streetscape Grant to E 14th <br />106