My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Funding for the design of improvements, including: medians; curb realignments; bike lanes; street trees; and <br />planting materials consistent with the design study prepared in 2005-06. <br />Description <br />Design, and under a separate project, construct improvements, including: medians, curb realignments, provisions for <br />bike lanes street trees, and planting materials consistent with the design study prepared in 2005-06. Project to <br />include obtaining and using recycled water for irrigation. Phase I and II improvements north of Davis Street are <br />completed. This project is Phase III of improvements on Doolittle Drive. <br />Justification or Benefit of Project <br />Improves this industrial area, which is an important entrance point into the city. The completed improvements along <br />the northern portion of Doolittle Drive up to the Oakland Airport are in stark contrast to this older industrialized section <br />of the city. These features will enhance the appearance of our city, and our connection with Oakland and the Oakland <br />International Airport by continuing the improvements made in the area over the past few years. <br />Consequences of not doing the Project <br />Without this project the street will remain as it currently exists. The success of the Shoreline development project <br />may be hindered without this entryway enhancement. <br />Project Numb 2006.0080Project Typ Roadway streetscape <br />Detailed Cost $400,000 Status Funded CIP <br />Department/Sponsor Community Development <br />Impact to Operation Cost Neutral Impact to Maintenance Cost Increase <br />Likely Cost <br />Categor Bicycle and Pedestrian <br />Project Name Doolittle Streetscape Davis-Fairway <br />107
The URL can be used to link to this page
Your browser does not support the video tag.