Laserfiche WebLink
Summary <br />Funding for the design of improvements, including: medians; curb realignments; bike lanes; street trees; and <br />planting materials consistent with the design study prepared in 2005-06. <br />Description <br />Design, and under a separate project, construct improvements, including: medians, curb realignments, provisions for <br />bike lanes street trees, and planting materials consistent with the design study prepared in 2005-06. Project to <br />include obtaining and using recycled water for irrigation. Phase I and II improvements north of Davis Street are <br />completed. This project is Phase III of improvements on Doolittle Drive. <br />Justification or Benefit of Project <br />Improves this industrial area, which is an important entrance point into the city. The completed improvements along <br />the northern portion of Doolittle Drive up to the Oakland Airport are in stark contrast to this older industrialized section <br />of the city. These features will enhance the appearance of our city, and our connection with Oakland and the Oakland <br />International Airport by continuing the improvements made in the area over the past few years. <br />Consequences of not doing the Project <br />Without this project the street will remain as it currently exists. The success of the Shoreline development project <br />may be hindered without this entryway enhancement. <br />Project Numb 2006.0080Project Typ Roadway streetscape <br />Detailed Cost $400,000 Status Funded CIP <br />Department/Sponsor Community Development <br />Impact to Operation Cost Neutral Impact to Maintenance Cost Increase <br />Likely Cost <br />Categor Bicycle and Pedestrian <br />Project Name Doolittle Streetscape Davis-Fairway <br />107