City of San Leandro Alvarado Commerce Center Project <br /> 84 <br /> 5 percent to/from north of Alvarado Street <br /> 5 percent to/from south of Alvarado Street <br /> 5 percent to/from Wayne Avenue <br /> 5 percent to/from west of Marina Boulevard <br /> 10 percent to/from west of Fairway Drive <br /> 20 percent to/from east of Marina Boulevard <br /> 25 percent to/from north of I-880 <br /> 25 percent to/from south of I-880 <br />Project trips were assigned to the roadway network based on the trip distribution patterns <br />discussed above. The assigned project trips were then added to traffic volumes under Existing <br />Conditions to generate Existing plus Project Conditions traffic volumes. <br />Existing plus Project Conditions – Warehouse <br />Traffic operations were evaluated at the study intersections under existing plus project conditions <br />and traffic generated by the project with the warehouse use. All signalized intersections were found <br />to operate within City of San Leandro standards during the A.M. and P.M. peak hours. The <br />unsignalized intersection of Alvarado Street and Montague Avenue, which operates at LOS E during <br />the A.M. peak hour, would not change from LOS E to LOS F (Table 18). Based on the City of San <br />Leandro LOS impact criteria, the project would have a less than significant impact at the study <br />intersections during both A.M. and P.M. peak hours. <br />Table 18 Existing plus Project Conditions Intersection Level of Service – Warehouse <br />Intersection Control Peak Hour <br />Existing Conditions <br />Existing plus <br />Project Conditions Change in <br />Delay2 <br />(Sec) <br />Significant <br />Impact? Delay1 LOS Delay1 LOS <br />Alvarado St. and <br />Aladdin Ave. <br />Signalized A.M. 47.1 D 47.7 D 0.90 No <br />P.M. 26.4 C 26.7 C 0.30 No <br />Teagarden St. and <br />Fairway <br />Dr./Aladdin Ave. <br />Signalized A.M. 20.3 C 20.5 C 0.20 No <br />P.M. 21.7 C 21.6 C -0.10 No <br />Alvarado St. and <br />Montague Ave. <br />Unsignalized A.M. 36.1 E 37.1 E 1.00 No <br />P.M. 21.4 C 21.8 C 0.40 No <br />Alvarado St. and <br />Marina Blvd. <br />Signalized A.M. 30.0 C 30.1 C 0.20 No <br />P.M. 23.9 C 24.0 C 0.10 No <br />Teagarden St. and <br />Marina Blvd. <br />Signalized A.M. 25.9 C 25.8 C -0.10 No <br />P.M. 35.2 D 35.3 D 0.10 No <br />1 Whole intersection weighted average control delay expressed in seconds per vehicle for signalized intersections. Total control delay <br />for the worst movement is presented for side-street stop – controlled intersections. 2 Change in delay between Existing and Existing plus Project Conditions. <br />Bold text indicates intersection operates at a deficient Level of Service. <br />Source: TJKM Traffic Impact Study 2017 <br />Two roadway segment operations were evaluated under existing plus project conditions. Both <br />roadway segments were found to operate within City of San Leandro standards during the A.M. and <br />P.M. peak hours (Table 19). As the project would not impact a roadway segment to change from LOS <br />E to better to LOS F, the project would have a less than significant impact at the study segments <br />during both A.M. and P.M. peak hours. <br />381