Laserfiche WebLink
Contractor's Price Proposal - Detail Continues.. <br />Work Order Title: <br />Work Order Number:052092.00 <br />San Leandro Marina Community Center <br />ceiling tiles <br />09 53 23 00-0005 2' x 4' Grid, 15/16" T Bar Ceiling Suspension System7 $2,049.12SF <br />Installation =x x 2,049.12FactorUnit PriceQuantity Total <br /> 2.07 1.2856 770.00 <br />Kitchen <br />09 53 23 00-0005 0121 For UL Listed (Fire Guard), Add8 $0.00MOD <br />Installation =x x 0.00 <br />FactorUnit PriceQuantity Total <br /> 0.07 1.2856 0.00 <br />09 53 23 00-0005 0129 For Compression Struts With Splay Wires, Add9 $0.00MOD <br />Installation =x x 0.00 <br />FactorUnit PriceQuantity Total <br /> 0.23 1.2856 0.00 <br />09 53 23 00-0005 0384 For Ceilings >10' High, Add10 $0.00MOD <br />Installation =x x 0.00FactorUnit PriceQuantity Total <br /> 0.12 1.2856 0.00 <br />09 53 23 00-0005 2' x 4' Grid, 15/16" T Bar Ceiling Suspension System11 $386.07SF <br />Installation =x x 0.00FactorUnit PriceQuantity Total <br /> 2.07 1.2856 0.00 <br />Demolition x x = 386.07 0.39 1.2856 770.00 <br />Kitchen <br />09 53 23 00-0005 0121 For UL Listed (Fire Guard), Add12 $58.49MOD <br />Installation =x x 58.49FactorUnit PriceQuantity Total <br /> 0.07 1.2856 650.00 <br />09 53 23 00-0005 0129 For Compression Struts With Splay Wires, Add13 $192.20MOD <br />Installation =x x 192.20FactorUnit PriceQuantity Total <br /> 0.23 1.2856 650.00 <br />09 53 23 00-0005 0384 For Ceilings >10' High, Add14 $100.28MOD <br />Installation =x x 100.28 <br />FactorUnit PriceQuantity Total <br /> 0.12 1.2856 650.00 <br />$6,904.19Subtotal for ceiling tiles <br />chair rail <br />06 46 23 00-0003 5/8" x 3-1/2" White Pine Shaped Chair Rail15 $629.43LF <br />Installation =x x 629.43 <br />FactorUnit PriceQuantity Total <br /> 6.12 1.2856 80.00 <br />Multipurpose rooms C <br />$629.43Subtotal for chair rail <br />demo <br />01 22 20 00-0015 LaborerFor tasks not included in the Construction Task Catalog® and as <br />directed by owner only. <br />16 $538.26HR <br />Installation =x x 538.26FactorUnit PriceQuantity Total <br /> 69.78 1.2856 6.00 <br />Used to uninstall/Re-install fire extinguishers, soap dispensers, signs, and paper towel dispensers. <br />01 66 19 00-0005 Handling Material For Over 125' Per CY Of Material Per 125'For delivery, <br />demolition or miscellaneous moving required by owner. <br />17 $821.18CY <br />Installation =x x 821.18FactorUnit PriceQuantity Total <br /> 3.65 1.2856 175.00 <br />used for moving cabs in , new kitchen equipment - materials and supplies for construction and demo <br />Page 2 of 6 <br />2/19/2018 <br />Contractor's Price Proposal - Detail <br />1416