My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent Calendar 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
8D Consent Calendar 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:50:43 PM
Creation date
5/2/2018 12:50:42 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Contractor's Price Proposal - Detail Continues.. <br />Work Order Title: <br />Work Order Number:052092.00 <br />San Leandro Marina Community Center <br />demo <br />01 74 19 00-0015 20 CY Dumpster (3 Ton) "Construction Debris"Includes delivery of dumpster, <br />rental cost, pick-up cost, hauling, and disposal fee. Non-hazardous material. <br />18 $1,902.69EA <br />Installation =x x 1,902.69FactorUnit PriceQuantity Total <br /> 740.00 1.2856 2.00 <br />used for demo of cabs, drywall frp lights ceiling flooring <br />06 41 13 00-0018 >24" To 30" Width, 34-1/2" High x 24" Deep Built In Place Base <br />CabinetPrefinished with solid hardwood face frames, hardwood door frames <br />and drawer fronts. Hardwood veneer on raised door panels. Excludes top. <br />19 $8,984.18LF <br />Installation =x x 0.00FactorUnit PriceQuantity Total <br /> 198.04 1.2856 0.00 <br />Demolition x x = 8,984.18 50.64 1.2856 138.00 <br />Multipurpose rooms B & C <br />06 83 00 00-0002 Fiberglass Reinforced Polyester (FRP) Paneling Including Adhesive And Trim20 $1,015.11SF <br />Installation =x x 0.00FactorUnit PriceQuantity Total <br /> 3.40 1.2856 0.00 <br />Demolition x x = 1,015.11 1.41 1.2856 560.00 <br />Kitchen <br />09 65 19 19-0002 1/8" Thick, Class 2 Through Pattern, Vinyl Composition Tile (VCT) <br />(Armstrong® Standard Excelon Imperial Texture®) <br />21 $3,204.23SF <br />Installation =x x 0.00FactorUnit PriceQuantity Total <br /> 2.70 1.2856 0.00 <br />Demolition x x = 3,204.23 1.34 1.2856 1,860.00 <br />Kitchen & Multipurpose room C <br />12 35 70 13-0037 25" Self Edge Laminate Countertop With Backsplash22 $2,806.67LF <br />Installation =x x 0.00FactorUnit PriceQuantity Total <br /> 174.79 1.2856 0.00 <br />Demolition x x = 2,806.67 15.82 1.2856 138.00 <br />$19,272.32Subtotal for demo <br />drywall <br />03 01 30 71-0006 Thin Patch/Skim Coat23 $3,153.32SF <br />Installation =x x 3,153.32 <br />FactorUnit PriceQuantity Total <br /> 1.46 1.2856 1,680.00 <br />Skim behind frp after removal <br />09 01 20 00-0006 >16 To 32 SF, Cut And Patch Hole In Drywall To Match ExistingPer location. <br />See CSI section 09 29 00 00-0001 for "Gypsum Board" repairs > 32 SF. <br />24 $341.46SF <br />Installation =x x 341.46FactorUnit PriceQuantity Total <br /> 8.30 1.2856 32.00 <br />Kitchen <br />$3,494.78Subtotal for drywall <br />Electrical <br />01 22 20 00-0010 ElectricianFor tasks not included in the Construction Task Catalog® and as <br />directed by owner only. <br />25 $1,762.40HR <br />Installation =x x 1,762.40FactorUnit PriceQuantity Total <br /> 85.68 1.2856 16.00 <br />Used to secure lights prior to demo, wire up appliances, trace circuits. Uninstall/Re-install Fire alarm pull, Fire <br />alarm strobe, Emergency Lighting(Bug eyes), Exit sign, and electrical conduit/octagon box. <br />26 01 50 51-0129 Recycle 4' Length Linear Fluorescent Lamps26 $16.31EA <br />Installation =x x 16.31 <br />FactorUnit PriceQuantity Total <br /> 0.47 1.2856 27.00 <br />Page 3 of 6 <br />2/19/2018 <br />Contractor's Price Proposal - Detail <br />1417
The URL can be used to link to this page
Your browser does not support the video tag.