My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent Calendar 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
8L Consent Calendar 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:50:49 PM
Creation date
5/2/2018 12:50:48 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
BAAQMD FYE 2017 TFCA Funding Agreement <br />TFCA Project 17R21 Page 9 <br />ATTACHMENT A <br />PROJECT INFORMATION <br />(Note: The section numbers shown in parentheses below refer to sections in the Agreement.) <br />1. Project Number (Section IV.5): 17R21 <br />2. Project Sponsor: City of San Leandro <br />3. Project Title: San Leandro Bikeway Project <br />4. Project Description: Project Sponsor shall construct and maintain 1.7 miles of Class II and 7.8 miles of <br />Class III bikeways in San Leandro, as further described in Sections 8, 9, and 10 of this Attachment A. <br />5. Project Goal: The goal of this Project is to reduce motor vehicle emissions and thereby improve air quality <br />by constructing, installing and maintaining new bicycle facilities to help commuters and residents to mode <br />shift to cycling and walking as alternatives to driving for short and first- and last-mile trips. <br />6. Project Operational Period: Seven (7) years starting from the date the last of the approved bicycle <br />facilities is placed into public service. <br />7. Project Schedule: <br />Milestone Date <br />Project Starts Effective Date of Agreement <br />All bicycle facilities are placed into public <br />service, start of the Project Operational Period <br /> Within two (2) years from the Effective <br />Date of Agreement <br />End of the Project Operational Period Seven (7) years from the Project <br />Operational Period start date <br />8. Special Conditions (Sections II.1, II.4, IV.3): <br />A. Project Sponsor shall use only State of California-licensed engineers and contractors or Project <br />Sponsor’s qualified employees to perform the Project work. <br />B. Project Sponsor shall site, install, construct, and maintain the Project bicycle facilities in <br />accordance with respective manufacturer’s specifications and requirements, applicable state, <br />federal and local laws and regulations, standards, guidelines, and best practices, including the <br />Americans with Disabilities Act (ADA) and the Caltrans California Highway Design Manual, <br />Information Bulletins and Memos. <br />C. Project Sponsor shall maintain the bicycle facilities in good repair and ensure that they remain <br />accessible to the public for the duration of the Project Operational Period. <br />D. Project Sponsor shall allow the Air District, and its authorized representatives, to collect and <br />share usage information about the Project. <br />1551
The URL can be used to link to this page
Your browser does not support the video tag.