Laserfiche WebLink
and pesticides that can contribute to storm water pollution. <br /> g. Where feasible, landscaping shall be designed and operated to treat <br /> storm water runoff by incorporating elements that collect, detain, and <br /> infiltrate runoff. In areas that provide detention of water, plans that are <br /> tolerant of saturated soil conditions and prolonged exposure to water shall <br /> be specified. <br /> h. Plant materials selected shall be appropriate to site specific <br /> characteristics such as soil type, topography, climate, amount and timing <br /> of sunlight, prevailing winds, rainfall, air movement, patterns of land use, <br /> ecological consistency and plant interactions to ensure successful <br /> establishment. <br /> i. Selection of the plants that will require minimal pesticide use. <br /> j. Irrigation shall be appropriate to the water requirements of the selected <br /> plants. <br /> k. The applicant shall select pest and disease resistant plants. <br /> I. The applicant shall plant a diversity of species to prevent a potential pest <br /> infestation from affecting the entire landscaping plan. <br /> m. The applicant shall plan insectary plants in the landscaping to attract and <br /> keep beneficial insects. <br /> n. All proposed storm drain onsite and offsite inlets shall be marked "NO <br /> DUMPING, DRAINS TO BAY" as per the City of San Leandro Standard <br /> Plan Dwg. No. 204. <br /> D. During construction the following high standards for sanitation are required: Garbage <br /> cans, construction dumpsters, and debris piles shall be removed on a minimum weekly <br /> basis. All food related trash items such as wrappers, cans, bottles, and food scraps <br /> shall be disposed of in closed containers only and shall be regularly removed from the <br /> site. The improvement shall construct a stabilized construction entrance per City <br /> Standard Detail Dwg. No. 606 or similar to prevent the tracking of sediment onto the <br /> public right-of-way. Inspections, conducted as part of the regular construction <br /> compliance, will be conducted to ensure compliance of the Applicant and contractors <br /> with this requirement. <br /> Off-Site Improvement Conditions: <br /> E. The Applicant shall obtain an Encroachment Permit from the Engineering and <br /> Transportation Department for any work within the Public Right-of-Way. <br /> Site Conditions: <br /> F. The Applicant shall combine the two separate parcels, or record a reciprocal private <br /> easement to memorialize the rights of both parcels to access the one proposed <br /> driveway to Fairway Drive and to access the alley in the rear of the properties. The Lot <br /> Line Adjustment/Parcel Combine application can be found at <br /> hftp://www.sanleandro.org/civicax/filebank/blobdload.aspx?blobid=361 7 <br /> if the applicant decides to merge the two parcels. <br /> G. The Applicant shall place all utilities serving the site underground. <br /> Grading Conditions: <br /> Agreement to Conditions February 1,2018 <br /> PLN 17-0023 Page 8 of 13 <br />