My WebLink
|
Help
|
About
|
Sign Out
Home
8K Consent Calendar 2018 0618
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0618
>
8K Consent Calendar 2018 0618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 6:36:51 PM
Creation date
6/14/2018 6:36:50 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/18/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
industrial purposes, or whether it will be decommissioned. Well <br />decommissioning is subject to permitting from Alameda County Public Works <br />Agency https://www.acpwa.org/drilling-and-wells-permit). Well <br />decommissioning permit approval from Alameda County shall be submitted to <br />the City prior to issuance of a Grading Permit. <br />4.On Sheet Al.1, the size of the trash enclosure shown at the rear of the property <br />appears to be inadequate for the proposed building size and use. The applicant <br />shall justify the enclosure sizing after discussions with Alameda County <br />Industries, Inc (ACI), solid waste and recyclable materials collection provider, <br />prior to Building Permit issuance. Also, per the Alameda Countywide Clean <br />Water Program, the trash enclosures shall have a roof to prevent storm water <br />from leaching through the trash to create storm water pollution. <br />5.The applicant shall locate all electric and communications utilities serving the <br />site underground prior to Certificate of Occupancy. <br />6.A lighting plan and photometric study shall be developed and submitted for <br />approval along with the Building Permit application to assure sufficient <br />illumination for the safety and security of the future building occupants. <br />G. Other <br />1.The Underground Utility District in lieu fee is estimated approximately in the <br />amount of$326,296.00, which is calculated at $358.25 per linear foot frontage <br />and shall be due at the time of Building Permit issuance. (Note: This fee is <br />subject to change on July 1st of each year and are not vested until Building <br />Permit issuance.) <br />2. Prior to Building Permit issuance, the applicant shall enter into an Improvement <br />Agreement with the City to guarantee installation of required public <br />improvements along the Marina Boulevard property frontage. The value of these <br />improvements shall be included in a detailed Engineer's Estimate subject to <br />review by the City. The guarantee will be in a financial instrument approved by <br />the City with a value equivalent to the Engineer's Estimate. <br />3.A one-time Development Fee for Street Improvements (DFSI) is estimated <br />approximately in the amount of $179,987.50, which is calculated at $1.19 per <br />square foot and shall be due at the time of Building Permit issuance. This <br />estimated fee includes a credit towards the DFSI for existing building on the <br />site. (Note: This fee is subject to change on July 1st of each year and are not <br />vested until Building Permit issuance.) <br />4.A one-time Marina Boulevard/Interstate 880 Traffic Impact Fee is estimated <br />approximately in the amount of $131,587.50, which is calculated at $0.87 per <br />square foot and shall be due at the time of Building permit issuance. This <br />estimated fee includes a credit towards the Marina Boulevard/Interstate 880 <br />Agreement to Conditions April 21,2017 <br />PLN 17-0005 Page 10 of 14728
The URL can be used to link to this page
Your browser does not support the video tag.