My WebLink
|
Help
|
About
|
Sign Out
Home
8K Consent Calendar 2018 0618
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0618
>
8K Consent Calendar 2018 0618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 6:36:51 PM
Creation date
6/14/2018 6:36:50 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/18/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Traffic Impact Fee for existing building on the site. (Note: This fee is subject to <br />change at the beginning of each fiscal year.) <br />5.The City plans to upgrade the traffic signal controls systems at three study <br />intersections with a Synchro Green Adaptive Traffic Signal Control System. The <br />three study intersections on Marina Boulevard include the I-880 northbound on- <br />ramp, the 1-880 southbound on-ramp, and the driveway to the Kaiser <br />Permanente Hospital. The City estimated the cost of design, installation, and <br />equipment for upgrading with Synchro Green Adaptive Traffic Signal Control <br />System at the three intersections to be $200,000. As per the Transportation <br />Impact Analysis Report (Transportation Impact Analysis, "Advanced <br />manufacturing at 2000 Marina Boulevard", by Kittleson & Associates, Inc., <br />dated 01/12/2017), last paragraph on page 47 specifies that the proposed project <br />contributes to cumulative traffic growth, hence the applicant shall contribute <br />17,530 for the signal control system upgrade. Said amount shall be due at the <br />time of Building permit issuance. <br />VI. ENVIRONMENTAL SERVICES DIVISION <br />A. Discharge of waste water other than domestic sewage to the sanitary sewer system <br />during grading, demolition, and construction shall require approval and/or permitting <br />from the City of San Leandro Water Pollution Control Plant, Environmental Services <br />Section. <br />B. In the event that asbestos-containing building materials (ACM) and lead-based paint <br />LBP) may be present on the property, prior to demolition of buildings and structures <br />e.g. decommissioned boiler room, labeled as a "chemical storage building" on Sheet <br />C.1), a comprehensive ACM and LBP survey shall be conducted. If present, these <br />materials shall be removed or stabilized prior to demolition. <br />VII. ALAMEDA COUNTY FIRE DEPARTMENT <br />A. Prior to issuance of Building Permits, submittals are required for the fire sprinkler <br />system, fire service underground and fire pump. <br />B. At the time of Building Permit submittal, documentation from the East Bay Municipal <br />Utility District EBMUD shall clearly show that the required fire flow is provided. <br />C. Knox Boxes shall be provided at the building main entrance and at any lockable gates <br />across the Fire Department access road. <br />D. Address shall be clearly marked, visible and legible from the street. <br />VIII. POLICE DEPARTMENT <br />A. All building addresses shall be placed in such a position as to be plainly visible and <br />legible from the street. Said numbers shall contrast with their background and be visible <br />at night. Details including number size and location shall be submitted for the review <br />Agreement to Conditions April 21,2017 <br />PLN 17-0005 Page 11 of 14729
The URL can be used to link to this page
Your browser does not support the video tag.