My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent Calendar 2018 0716
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0305
>
Packet 2018 0716
>
8G Consent Calendar 2018 0716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2018 12:33:53 PM
Creation date
7/11/2018 12:33:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/16/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
DATE: 2017-11-13 <br /> ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK <br /> BY THE <br /> UNION PACIFIC RAILROAD <br /> <br /> THIS ESTIMATE GOOD FOR 6 MONTHS EXPIRATION DATE IS :2018-05-14 <br /> <br /> DESCRIPTION OF WORK: <br /> SAN LEANDRO,CA / ALVARADO RD / DOT# 912075T-3 / NILES SUB / MP 14.98 <br /> INSTALL 2EA 8TF ROAD CROSSING SURFACES TO FUNCTION AS SIDE WALKS ON <br /> BOTH SIDES OF THE EXISTING ROAD CROSSING <br /> PROJECT WAS BUILT USING STANDARD RECOLLECT ADDITIVE, 260% <br /> UPRR WILL BE REIMBURSED FOR 100% OF PROJECT COSTS BY THE CITY OF SAN <br /> <br /> PID: 91087 AWO: 30080 MP,SUBDIV: 14.98, NILES <br /> SERVICE UNIT: 19 CITY: SAN LEANDRO STATE: CA <br /> <br /> DESCRIPTION QTY UNIT LABOR MATERIAL RECOLL UPRR TOTAL <br /> ----------- --- ---- ----- -------- ------- ----- ----- <br /> <br /> ENGINEERING WORK <br /> ENGINEERING 1304 1304 1304 <br /> FLAGGING 304 304 304 <br /> LABOR ADDITIVE 260% 4972 4972 4972 <br /> TRACK 304 304 304 <br /> ------- -------- -------- -------- -------- <br /> TOTAL ENGINEERING 6884 6884 6884 <br /> <br /> SIGNAL WORK <br /> LABOR ADDITIVE 260% 699 699 699 <br /> SIGNAL 320 5 325 325 <br /> ------- -------- -------- -------- -------- <br /> TOTAL SIGNAL 1019 5 1024 1024 <br /> <br /> TRACK & SURFACE WORK <br /> BALAST 2.00 CL 340 1998 2338 2338 <br /> BILL PREP FEE 900 900 900 <br /> ENVIRONMENTAL PERMITS 10 10 10 <br /> FOREIGN LINE FREIGHT 657 657 657 <br /> HOMELINE FREIGHT 900 900 900 <br /> LABOR ADDITIVE 260 10556 10556 10556 <br /> MATL STORE EXPENSE 57 57 57 <br /> OTM 815 1395 2210 2210 <br /> RDXING 16.00 TF 3091 3650 6741 6741 <br /> SALES TAX 368 368 368 <br /> SWTIE 32.00 EA 2222 2222 2222 <br /> TRK-SURF,LIN 680 680 680 <br /> XTIES -UNLD 1243 1243 1243 <br /> ------- -------- -------- -------- -------- <br /> TOTAL TRACK & SURFACE 16725 12157 28882 28882 <br /> <br /> ------- -------- <br /> LABOR/MATERIAL EXPENSE 24628 12162 -------- -------- <br /> RECOLLECTIBLE/UPRR EXPENSE 36790 0 -------- <br /> ESTIMATED PROJECT COST 36790 <br /> <br /> <br />THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN THE EVENT OF <br />AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED, <br />UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.