Laserfiche WebLink
5.00 <br />Contractor's Price Proposal - Detail <br />San Leandro Library Boiler Additional Scope Supplemental <br />049724.01 <br />CA-H08B-082013-AESIQC Master Contract #: <br />Work Order #: <br />Owner PO #: <br />Title: <br />Re: <br />July 02, 2018Date: <br />Proposal Value: <br />Contractor: ACCO Engineered Systems <br />$105,727.31 <br />(Excludes)Equip.MaterialLabor <br />Line TotalDescriptionUOMMod.ItemSect. <br />01 - General Requirements <br />01 22 16 00 0002 Reimbursable FeesReimbursable fees will be paid to the contractor for the <br />actual cost, without mark-up, for which a receipt or bill is received. The <br />Adjustment Factor applied to Reimbursable Fees will be 1.0000. The labor <br />cost involved in obtaining all permits is in the Adjustment Factor. The base <br />cost of the Reimbursable Fee is $1.00. The quantity used will adjust the base <br />cost to the actual Reimbursable Fee (e.g. quantity of 125 = $125.00 <br />Reimbursable Fee). If there are multiple Reimbursable Fees, each one shall be <br />listed separately with a comment in the "note" block to identify the <br />Reimbursable Fees (e.g. sidewalk closure, road cut, various permits, <br />extended warrantee, expedited shipping costs, etc.). A copy of each receipt <br />shall be included with the Proposal. <br />1 $2,628.67EA <br />Installation =x x 2,628.67FactorUnit PriceQuantity Total <br /> 1.00 1.2432 2,114.44 <br />P&P Bonds per EZIQC gerneral conditions $105,727.31 @ 2% = 2114.44 <br />01 22 20 00 0036 Steam / Pipe FitterTasks in the CTC include appropriate costs to cover labor. <br />These tasks will be requested specifically by the owner for miscellaneous <br />work not covered in the CTC. <br />2 $1,112.76HR <br />Installation =x x 1,112.76 <br />FactorUnit PriceQuantity Total <br /> 74.59 1.2432 12.00 <br />UA personnel to attend building inspections / 3rd party special inspections as required by the city building <br />department. 3 visits at 4 hours each included. <br />01 22 20 00 0036 Steam / Pipe FitterTasks in the CTC include appropriate costs to cover labor. <br />These tasks will be requested specifically by the owner for miscellaneous <br />work not covered in the CTC. <br />3 $1,483.68HR <br />Installation =x x 1,483.68 <br />FactorUnit PriceQuantity Total <br /> 74.59 1.2432 16.00 <br />On site personnel to field detail the final installation desigh for fabrication based on the issue for permit <br />drawings <br />01 22 20 00 0036 0004 For Foreman, Add4 $74.19MOD <br />Installation =x x 74.19FactorUnit PriceQuantity Total <br /> 3.73 1.2432 16.00 <br />01 22 20 00 0050 Senior Engineer Or Specialty ConsultantEngineering services by prime <br />contractor to develop project-specific construction drawings and <br />specifications. <br />5 $6,713.28HR <br />Installation =x x 6,713.28 <br />FactorUnit PriceQuantity Total <br /> 150.00 1.2432 36.00 <br />Electrical Engineer per owners request. Hours include (2) site visits. Office staff hours to support the <br />plans. 2 workers 18 hours each of site visits, cad / design work. <br />01 22 20 00 0050 Senior Engineer Or Specialty ConsultantEngineering services by prime <br />contractor to develop project-specific construction drawings and <br />specifications. <br />6 $3,729.60HR <br />Installation =x x 3,729.60 <br />FactorUnit PriceQuantity Total <br /> 150.00 1.2432 20.00 <br />Specialty Consultant to develop city planning required seismic isolation calculations for plan check, permitting <br />and inspection. 20 hours allotted for design work. <br />Page 1 of 7 <br />7/2/2018 <br />Contractor's Price Proposal - Detail