My WebLink
|
Help
|
About
|
Sign Out
Home
8U Consent Calendar 2018 0716
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0305
>
Packet 2018 0716
>
8U Consent Calendar 2018 0716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2018 12:34:03 PM
Creation date
7/11/2018 12:34:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/16/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Contractor's Price Proposal - Detail Continues.. <br />Work Order Title: <br />Work Order Number:049724.01 <br />San Leandro Library Boiler Additional Scope Supplemental <br />01 - General Requirements <br />01 22 20 00 0050 Senior Engineer Or Specialty ConsultantEngineering services by prime <br />contractor to develop project-specific construction drawings and <br />specifications. <br />7 $11,188.80HR <br />Installation =x x 11,188.80 <br />FactorUnit PriceQuantity Total <br /> 150.00 1.2432 60.00 <br />Mechanical Engineer per owners request. Hours include (2) site visits. Office staff hours to support the <br />plans. 3 workers 20 hours each of site visits, cad / design work. <br />01 22 20 00 0050 Senior Engineer Or Specialty ConsultantEngineering services by prime <br />contractor to develop project-specific construction drawings and <br />specifications. <br />8 $3,729.60HR <br />Installation =x x 3,729.60FactorUnit PriceQuantity Total <br /> 150.00 1.2432 20.00 <br />Specialty Consultant to develop city planning required structural calculations for plan check, permitting and <br />inspections. 20 hour allotted for design work <br />01 22 20 00 0050 Senior Engineer Or Specialty ConsultantEngineering services by prime <br />contractor to develop project-specific construction drawings and <br />specifications. <br />9 $2,237.76HR <br />Installation =x x 2,237.76FactorUnit PriceQuantity Total <br /> 150.00 1.2432 12.00 <br />Special Inspector required by city for seismic and anchorage inspections <br />01 22 20 00 0050 Senior Engineer Or Specialty ConsultantEngineering services by prime <br />contractor to develop project-specific construction drawings and <br />specifications. <br />10 $3,729.60HR <br />Installation =x x 3,729.60 <br />FactorUnit PriceQuantity Total <br /> 150.00 1.2432 20.00 <br />Building Engineer per owners request. Hours include (1) site visit. Office staff hours to support the plans. <br />1 worker 20 hours of site visits, cad / design work. <br />01 22 23 00 0926 1/2 To 3/4 Ton, 4 x 2 Light Duty Conventional Pickup Truck With Full-Time <br />Truck Driver <br />11 $3,348.14DAY <br />Installation =x x 3,348.14FactorUnit PriceQuantity Total <br /> 673.29 1.2432 4.00 <br />Truck and driver for equipment pick up / delivery, tool delivery etc. <br />01 74 19 00 0013 10 CY Dumpster "Construction Debris"Includes delivery of dumpster, rental <br />cost, pick-up cost, hauling, and disposal fee. Non-hazardous material. <br />12 $341.87EA <br />Installation =x x 341.87 <br />FactorUnit PriceQuantity Total <br /> 274.99 1.2432 1.00 <br />Disposal fees for removed pumps, piping and fittings. <br />01 74 19 00 0018 10 CY Low-Boy Dumpster "Concrete Only"Includes delivery of dumpster, <br />rental cost, pick-up cost, hauling, and disposal fee. Concrete only. <br />13 $553.21EA <br />Installation =x x 553.21 <br />FactorUnit PriceQuantity Total <br /> 444.99 1.2432 1.00 <br />Concrete recycling <br />$40,871.16Subtotal for 01 - General Requirements <br />02 - Site Work <br />02 25 16 00 0005 X-Ray Survey Up To 2 SF Of Concrete, Masonry Or Asphalt14 $1,984.45EA <br />Installation =x x 1,984.45FactorUnit PriceQuantity Total <br /> 133.02 1.2432 12.00 <br />Slab scanning for utilities as required by owner <br />Page 2 of 7 <br />7/2/2018 <br />Contractor's Price Proposal - Detail
The URL can be used to link to this page
Your browser does not support the video tag.